Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.
1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Milwaukee Area Office Address: as printed on your citation
SULLIVAN PRECISION PLATE, LLC. 460 CARDINAL LANE, HARTLAND, WI 53029
The hazards referenced in Inspection Number 1875869 for the violations identified below were corrected as follows:
Citation 1, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 5 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 6 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 7 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 2 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected walking-working surface, railing or ladder
Invoice for repair or replacement
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written respiratory protection program · Plain-English summary, not legal advice
Where respirators are needed to protect employees' health, or the employer requires them, there must be a written respiratory protection program with worksite-specific procedures that is put into practice and updated when conditions change. It covers, as applicable, respirator selection, medical evaluations, fit testing, use, maintenance, air quality, training and program evaluation.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written respiratory protection program
Fit-test records
Medical evaluation records (keep confidential details out)
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Nov 10, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 2, 2026, as issued, to November 10, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written respiratory protection program
Fit-test records
Medical evaluation records (keep confidential details out)
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Energy control (lockout/tagout) program · Plain-English summary, not legal advice
The employer must have an energy control program made up of written procedures, employee training and periodic inspections, so that before anyone services or maintains a machine that could start up or release stored energy unexpectedly, it is isolated from its energy source and made inoperative.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written energy-control (lockout/tagout) procedure for the machine
Training roster for authorized and affected employees
Record of the periodic inspection of the procedure
Photo of the lockout points and locks or tags
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written lockout/tagout procedures · Plain-English summary, not legal advice
Procedures for controlling hazardous energy must be written down and used whenever employees service or maintain machines (a limited exception applies when a machine meets every listed condition). The procedures must clearly set out their scope, purpose, authorization, rules and the steps for shutting down, isolating, blocking and securing the machine, placing and removing locks or tags, and checking that the energy is controlled.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written energy-control (lockout/tagout) procedure for the machine
Training roster for authorized and affected employees
Record of the periodic inspection of the procedure
Photo of the lockout points and locks or tags
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Operator training and evaluation certificates
Daily truck inspection checklist
Repair invoice if the truck was fixed or taken out of service
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Hazard communication training · Plain-English summary, not legal advice
Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.179(j)(1)(ii)(A)
Aug 19, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is August 19, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.184(e)(2)(i)
Sep 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 12, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 2, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
SULLIVAN PRECISION PLATE, LLC. will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1875869 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Citation 1, Item 1 (29 CFR 1910.28(b)(11)(ii))
Citation 1, Item 2a (29 CFR 1910.134(c)(1))
Citation 1, Item 2b (29 CFR 1910.134(d)(1)(iii))
Citation 1, Item 4a (29 CFR 1910.147(c)(1))
Citation 1, Item 4b (29 CFR 1910.147(c)(4)(i))
Citation 1, Item 5 (29 CFR 1910.178(l)(1)(i))
Citation 1, Item 6 (29 CFR 1910.184(d))
Citation 1, Item 7 (29 CFR 1910.1200(h)(1))
Citation 2, Item 1 (29 CFR 1910.179(j)(1)(ii)(A))
Citation 2, Item 2 (29 CFR 1910.184(e)(2)(i))
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Milwaukee Area Office
Identified from the office code in the public record (0523400). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 10 items have been corrected, with the date and how
Verification of 10 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.