7 CARTER STREET APT 3, LOWELL, MA 01852 · OSHA inspection 1885566 · citation issued Sep 10, 2026 · prepared Saturday, November 21, 2026
Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.
1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Concord Area Office Address: as printed on your citation
PL CONSTRUCTION CORPORATION 7 CARTER STREET APT 3, LOWELL, MA 01852
The hazards referenced in Inspection Number 1885566 for the violations identified below were corrected as follows:
Citation 1, Item 1a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1e was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3e was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 3, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 3, Item 2 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
Fall protection training · Plain-English summary, not legal advice
Each employee who might be exposed to fall hazards must be trained to recognize the hazards of falling and in the procedures to follow to minimize them.
Head protection · Plain-English summary, not legal advice
Employees working where there is a possible danger of head injury from impact, from falling or flying objects, or from electrical shock and burns must be protected by protective helmets.
Fall protection in residential construction · Plain-English summary, not legal advice
Each employee doing residential construction work 6 feet or more above a lower level must be protected by guardrails, a safety net or a personal fall arrest system, unless another provision allows something else. If the employer can show those systems are infeasible or create a greater hazard, a written fall protection plan meeting 1926.502(k) is required instead.
Other-than-serious item under 29 CFR 1903.19(d)(1)
Sep 29, 2026 per the public record · certification generally due Oct 9, 2026 (estimate)
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
PL CONSTRUCTION CORPORATION will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1885566 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Citation 1, Item 1a (29 CFR 1926.20(b)(2))
Citation 1, Item 1b (29 CFR 1926.451(f)(3))
Citation 1, Item 1c (29 CFR 1926.451(f)(7))
Citation 1, Item 1d (29 CFR 1926.454(a))
Citation 1, Item 1e (29 CFR 1926.503(a)(1))
Citation 1, Item 2 (29 CFR 1926.100(a))
Citation 1, Item 3a (29 CFR 1926.451(e)(1))
Citation 1, Item 3b (29 CFR 1926.451(g)(1)(i))
Citation 1, Item 3c (29 CFR 1926.502(d)(15)(ii))
Citation 1, Item 3d (29 CFR 1926.502(d)(17))
Citation 1, Item 3e (29 CFR 1926.452(k)(4))
Citation 2, Item 1 (29 CFR 1926.501(b)(13))
Citation 3, Item 1 (29 CFR 1903.19(c)(1))
Citation 3, Item 2 (29 CFR 1903.19(d)(1))
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Concord Area Office
Identified from the office code in the public record (0111700). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 14 items have been corrected, with the date and how
Abatement documents for willful or repeat items (required by 1903.19(d))
A check of the abatement dates against your citation copy
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.