1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Sioux Falls Area Office Address: as printed on your citation
The hazards referenced in Inspection Number 1885731 for the violations identified below were corrected as follows:
Citation 1, Item 1a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
Fall protection at unprotected sides and edges · Plain-English summary, not legal advice
Each employee on a walking-working surface with an unprotected side or edge 4 feet or more above a lower level must be protected by guardrails, a safety net, or a personal fall protection system (fall arrest, travel restraint or positioning), except where the section provides otherwise.
Oct 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from October 21, 2026, as issued, to October 30, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected walking-working surface, railing or ladder
Invoice for repair or replacement
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from October 21, 2026, as issued, to October 30, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected walking-working surface, railing or ladder
Invoice for repair or replacement
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from October 21, 2026, as issued, to October 30, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected walking-working surface, railing or ladder
Invoice for repair or replacement
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written energy-control (lockout/tagout) procedure for the machine
Training roster for authorized and affected employees
Record of the periodic inspection of the procedure
Photo of the lockout points and locks or tags
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written lockout/tagout procedures · Plain-English summary, not legal advice
Procedures for controlling hazardous energy must be written down and used whenever employees service or maintain machines (a limited exception applies when a machine meets every listed condition). The procedures must clearly set out their scope, purpose, authorization, rules and the steps for shutting down, isolating, blocking and securing the machine, placing and removing locks or tags, and checking that the energy is controlled.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written energy-control (lockout/tagout) procedure for the machine
Training roster for authorized and affected employees
Record of the periodic inspection of the procedure
Photo of the lockout points and locks or tags
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Yearly inspection of lockout/tagout procedures · Plain-English summary, not legal advice
At least once a year, an authorized employee other than the ones using a procedure must inspect each energy control procedure to make sure it is being followed and to correct problems. The employer must certify each inspection in writing: the machine, the date, the employees included and who did the inspection.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written energy-control (lockout/tagout) procedure for the machine
Training roster for authorized and affected employees
Record of the periodic inspection of the procedure
Photo of the lockout points and locks or tags
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Machine guarding · Plain-English summary, not legal advice
One or more methods of machine guarding must protect the operator and other employees in the machine area from hazards such as the point of operation, ingoing nip points, rotating parts, and flying chips and sparks. Barrier guards, two-hand tripping devices and electronic safety devices are examples.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Point-of-operation guarding · Plain-English summary, not legal advice
Where a machine's point of operation (the area where work is done on the material) could injure an employee, it must be guarded so the operator cannot put any part of the body in the danger zone during the operating cycle. Hand tools for placing material can add protection but cannot replace guarding.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Nov 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from October 21, 2026, as issued, to November 30, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Nov 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from October 21, 2026, as issued, to November 30, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Oct 21, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 20, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 21, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
DAKOTA PROVISIONS, LLC will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1885731 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Citation 1, Item 1a (29 CFR 1910.28(b)(1)(i))
Citation 1, Item 1b (29 CFR 1910.28(b)(3)(iv))
Citation 1, Item 1c (29 CFR 1910.28(b)(14)(i))
Citation 1, Item 2a (29 CFR 1910.147(d)(4)(i))
Citation 1, Item 2b (29 CFR 1910.147(c)(4)(i))
Citation 1, Item 2c (29 CFR 1910.147(c)(6)(i))
Citation 1, Item 3a (29 CFR 1910.212(a)(1))
Citation 1, Item 3b (29 CFR 1910.212(a)(3)(ii))
Citation 1, Item 3c (29 CFR 1910.219(e)(3)(i))
Citation 1, Item 3d (29 CFR 1910.219(f)(3))
Citation 1, Item 4a (29 CFR 1910.303(b)(2))
Citation 1, Item 4b (29 CFR 1910.305(b)(2)(i))
Citation 1, Item 4c (29 CFR 1910.303(g)(1)(i)(A))
Citation 1, Item 4d (29 CFR 1910.333(c)(2))
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Sioux Falls Area Office
Identified from the office code in the public record (0830400). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 14 items have been corrected, with the date and how
Verification of 14 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.