THE ANIMAL INN, LLC

831 NEWVILLE ROAD, CARLISLE, PA 17013 · OSHA inspection 1895594 · citation issued Aug 4, 2026 · prepared Sunday, November 22, 2026

Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.

1. Certification letter

Abatement certification · draft

To: Area Director, OSHA Harrisburg Area Office
Address: as printed on your citation

THE ANIMAL INN, LLC
831 NEWVILLE ROAD, CARLISLE, PA 17013

The hazards referenced in Inspection Number 1895594 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 2a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  3. Citation 1, Item 2b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  4. Citation 1, Item 2c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  5. Citation 1, Item 3 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  6. Citation 1, Item 4 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  7. Citation 1, Item 5 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  8. Citation 1, Item 6a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  9. Citation 1, Item 6b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  10. Citation 1, Item 6c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  11. Citation 2, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

2. Item-by-item closeout

Citation 1 · Item 1 · 29 CFR 1910.28(b)(3)(ii) · Serious

Serious item under 29 CFR 1910.28(b)(3)(ii)

Aug 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from August 28, 2026, as issued, to August 31, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the corrected walking-working surface, railing or ladder
  • Invoice for repair or replacement
  • Inspection record

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2a · 29 CFR 1910.36(d)(1) · Serious

Serious item under 29 CFR 1910.36(d)(1)

Aug 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from August 28, 2026, as issued, to August 31, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the cleared or marked exit route
  • Page of your emergency action or fire prevention plan
  • Training roster

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2b · 29 CFR 1910.37(b)(2) · Serious

Serious item under 29 CFR 1910.37(b)(2)

Aug 28, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is August 28, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the cleared or marked exit route
  • Page of your emergency action or fire prevention plan
  • Training roster

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2c · 29 CFR 1910.37(b)(4) · Serious

Serious item under 29 CFR 1910.37(b)(4)

Aug 28, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is August 28, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the cleared or marked exit route
  • Page of your emergency action or fire prevention plan
  • Training roster

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 3 · 29 CFR 1910.95(c)(1) · Serious

Hearing conservation program · Plain-English summary, not legal advice

When employee noise exposure reaches or exceeds an 8-hour time-weighted average of 85 decibels (A-weighted), or a 50 percent dose, the employer must run a continuing, effective hearing conservation program as described in paragraphs (c) through (o) of the standard, including monitoring, audiometric testing, hearing protectors, training and records.

Official text

Aug 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from August 28, 2026, as issued, to August 31, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Noise monitoring results
  • Page of your hearing conservation program
  • Audiometric testing schedule (no individual results)
  • Training roster

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 4 · 29 CFR 1910.133(a)(1) · Serious

Serious item under 29 CFR 1910.133(a)(1)

Aug 28, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is August 28, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Written PPE hazard assessment certification
  • Purchase record for the protective equipment
  • Training roster

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 5 · 29 CFR 1910.151(c) · Serious

Serious item under 29 CFR 1910.151(c)

Aug 28, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is August 28, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the corrected first-aid or sanitation provision
  • Purchase record
  • Inspection record

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 6a · 29 CFR 1910.1200(e)(1) · Serious

Written hazard communication program · Plain-English summary, not legal advice

Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.

Official text

Sep 8, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 8, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written hazard communication program
  • Safety data sheet index or binder page
  • Training roster with date and topics
  • Photo of the corrected container labels

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 6b · 29 CFR 1910.1200(g)(8) · Serious

Serious item under 29 CFR 1910.1200(g)(8)

Sep 8, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 8, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written hazard communication program
  • Safety data sheet index or binder page
  • Training roster with date and topics
  • Photo of the corrected container labels

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 6c · 29 CFR 1910.1200(h)(1) · Serious

Hazard communication training · Plain-English summary, not legal advice

Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.

Official text

Oct 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 8, 2026, as issued, to October 30, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written hazard communication program
  • Safety data sheet index or binder page
  • Training roster with date and topics
  • Photo of the corrected container labels

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 2 · Item 1 · 29 CFR 1904.32(a)(2) · Other-than-serious

Other-than-serious item under 29 CFR 1904.32(a)(2)

Sep 8, 2026 per the public record · Verification required, no certification date estimated. Informal settlement, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 8, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Corrected OSHA 300 log page
  • Corrected or posted OSHA 300A summary
  • Record of the electronic submission if one was required

Suggestions only, not a statement of what OSHA requires or will accept.

3. Employee posting

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

THE ANIMAL INN, LLC will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1895594 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1 (29 CFR 1910.28(b)(3)(ii))
  • Citation 1, Item 2a (29 CFR 1910.36(d)(1))
  • Citation 1, Item 2b (29 CFR 1910.37(b)(2))
  • Citation 1, Item 2c (29 CFR 1910.37(b)(4))
  • Citation 1, Item 3 (29 CFR 1910.95(c)(1))
  • Citation 1, Item 4 (29 CFR 1910.133(a)(1))
  • Citation 1, Item 5 (29 CFR 1910.151(c))
  • Citation 1, Item 6a (29 CFR 1910.1200(e)(1))
  • Citation 1, Item 6b (29 CFR 1910.1200(g)(8))
  • Citation 1, Item 6c (29 CFR 1910.1200(h)(1))
  • Citation 2, Item 1 (29 CFR 1904.32(a)(2))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

4. Where to send it

Where to send this

OSHA Harrisburg Area Office

Identified from the office code in the public record (0316700). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 11 items have been corrected, with the date and how
  • Verification of 11 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
  • The name and title of the person signing
  • Signature of the employer or an authorized representative
  • Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
  • Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
  • No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
  • No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
  • Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
  • The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
  • 29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.