1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Atlanta East Area Office Address: as printed on your citation
MAZCON, A KURTZ BROS. COMPANY, LLC 3240 AVONDALE MILL ROAD, MACON, GA 31216
The hazards referenced in Inspection Number 1895769 for the violations identified below were corrected as follows:
Citation 1, Item 1a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 5 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 3, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
Medical evaluation for respirator use · Plain-English summary, not legal advice
Before an employee is fit tested or required to use a respirator at work, the employer must provide a medical evaluation of the employee's ability to use a respirator.
Nov 9, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 9, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written respiratory protection program
Fit-test records
Medical evaluation records (keep confidential details out)
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Respirator fit testing · Plain-English summary, not legal advice
Employees who use tight-fitting facepiece respirators must be fit tested before first use, whenever they switch to a different facepiece (size, style, model or make), and at least once a year after that.
Dec 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 9, 2026, as issued, to December 30, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written respiratory protection program
Fit-test records
Medical evaluation records (keep confidential details out)
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.134(g)(1)(i)(A)
Dec 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 9, 2026, as issued, to December 30, 2026.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written respiratory protection program
Fit-test records
Medical evaluation records (keep confidential details out)
Training roster
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.134(k)(1)
Dec 30, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 9, 2026, as issued, to December 30, 2026.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written respiratory protection program
Fit-test records
Medical evaluation records (keep confidential details out)
Training roster
Suggestions only, not a statement of what OSHA requires or will accept.
Apr 29, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 9, 2026, as issued, to April 29, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Dec 2, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is December 2, 2026.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.1200(h)(3)
Nov 9, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 9, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 9, 2026.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
MAZCON, A KURTZ BROS. COMPANY, LLC will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1895769 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Citation 1, Item 1a (29 CFR 1910.134(e)(1))
Citation 1, Item 1b (29 CFR 1910.134(f)(2))
Citation 1, Item 1c (29 CFR 1910.134(g)(1)(i)(A))
Citation 1, Item 1d (29 CFR 1910.134(k)(1))
Citation 1, Item 4 (29 CFR 1910.1000(a)(2))
Citation 1, Item 5 (29 CFR 1910.1000(e))
Citation 3, Item 1 (29 CFR 1910.1200(h)(3))
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Atlanta East Area Office
Identified from the office code in the public record (0418100). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 7 items have been corrected, with the date and how
Verification of 7 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).