Skip to content

Abatement packet · DRAFT — PREVIEW

J & S FABRICATIONS

9330 ALLENTOWN BOULEVARD, GRANTVILLE, PA 17028 · OSHA inspection 1898995 · citation issued Sep 21, 2026 · prepared Saturday, November 21, 2026

Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.

1. Certification letter

Abatement certification · draft

To: Area Director, OSHA Harrisburg Area Office
Address: as printed on your citation

J & S FABRICATIONS
9330 ALLENTOWN BOULEVARD, GRANTVILLE, PA 17028

The hazards referenced in Inspection Number 1898995 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 1b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  3. Citation 1, Item 1c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  4. Citation 1, Item 1d was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  5. Citation 1, Item 1e was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  6. Citation 1, Item 2a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  7. Citation 1, Item 2b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  8. Citation 1, Item 2c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  9. Citation 2, Item 1a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  10. Citation 2, Item 1b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

2. Item-by-item closeout

Citation 1 · Item 1a · 29 CFR 1910.95(c)(1) · Other-than-serious

Hearing conservation program · Plain-English summary, not legal advice

When employee noise exposure reaches or exceeds an 8-hour time-weighted average of 85 decibels (A-weighted), or a 50 percent dose, the employer must run a continuing, effective hearing conservation program as described in paragraphs (c) through (o) of the standard, including monitoring, audiometric testing, hearing protectors, training and records.

Official text

Apr 30, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from October 26, 2026, as issued, to April 30, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Noise monitoring results
  • Page of your hearing conservation program
  • Audiometric testing schedule (no individual results)
  • Training roster

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 1b · 29 CFR 1910.95(d)(1) · Other-than-serious

Other-than-serious item under 29 CFR 1910.95(d)(1)

Verification required. No abatement date in the public record. Use the date on your citation.

Public record: Recorded in the public data as corrected during the inspection.

Not yet confirmed by the employer. Nothing is certified for this item.

The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).

Evidence on file: 0 files

Possible supporting evidence

  • Noise monitoring results
  • Page of your hearing conservation program
  • Audiometric testing schedule (no individual results)
  • Training roster

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 1c · 29 CFR 1910.95(g)(1) · Other-than-serious

Other-than-serious item under 29 CFR 1910.95(g)(1)

Apr 30, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to April 30, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Noise monitoring results
  • Page of your hearing conservation program
  • Audiometric testing schedule (no individual results)
  • Training roster

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 1d · 29 CFR 1910.95(i)(2)(i) · Other-than-serious

Other-than-serious item under 29 CFR 1910.95(i)(2)(i)

Apr 30, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to April 30, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Noise monitoring results
  • Page of your hearing conservation program
  • Audiometric testing schedule (no individual results)
  • Training roster

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 1e · 29 CFR 1910.95(k)(1) · Other-than-serious

Other-than-serious item under 29 CFR 1910.95(k)(1)

Apr 30, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to April 30, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Noise monitoring results
  • Page of your hearing conservation program
  • Audiometric testing schedule (no individual results)
  • Training roster

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2a · 29 CFR 1910.147(c)(1) · Serious

Energy control (lockout/tagout) program · Plain-English summary, not legal advice

The employer must have an energy control program made up of written procedures, employee training and periodic inspections, so that before anyone services or maintains a machine that could start up or release stored energy unexpectedly, it is isolated from its energy source and made inoperative.

Official text

Mar 1, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to March 1, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written energy-control (lockout/tagout) procedure for the machine
  • Training roster for authorized and affected employees
  • Record of the periodic inspection of the procedure
  • Photo of the lockout points and locks or tags

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2b · 29 CFR 1910.147(c)(4)(i) · Serious

Written lockout/tagout procedures · Plain-English summary, not legal advice

Procedures for controlling hazardous energy must be written down and used whenever employees service or maintain machines (a limited exception applies when a machine meets every listed condition). The procedures must clearly set out their scope, purpose, authorization, rules and the steps for shutting down, isolating, blocking and securing the machine, placing and removing locks or tags, and checking that the energy is controlled.

Official text

Mar 1, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to March 1, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written energy-control (lockout/tagout) procedure for the machine
  • Training roster for authorized and affected employees
  • Record of the periodic inspection of the procedure
  • Photo of the lockout points and locks or tags

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2c · 29 CFR 1910.147(c)(7)(i) · Serious

Lockout/tagout training · Plain-English summary, not legal advice

Employees must be trained so the energy control program is understood: authorized employees on recognizing and isolating hazardous energy, affected employees on the purpose and use of the procedures, and others in the area about the procedures. Retraining is required when jobs, machines or procedures change, and training must be certified in writing with each employee's name and dates.

Official text

Mar 1, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to March 1, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written energy-control (lockout/tagout) procedure for the machine
  • Training roster for authorized and affected employees
  • Record of the periodic inspection of the procedure
  • Photo of the lockout points and locks or tags

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 2 · Item 1a · 29 CFR 1910.1200(e)(1) · Other-than-serious

Written hazard communication program · Plain-English summary, not legal advice

Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.

Official text

Mar 1, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to March 1, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written hazard communication program
  • Safety data sheet index or binder page
  • Training roster with date and topics
  • Photo of the corrected container labels

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 2 · Item 1b · 29 CFR 1910.1200(h)(1) · Other-than-serious

Hazard communication training · Plain-English summary, not legal advice

Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.

Official text

Mar 1, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 6, 2026, as issued, to March 1, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written hazard communication program
  • Safety data sheet index or binder page
  • Training roster with date and topics
  • Photo of the corrected container labels

Suggestions only, not a statement of what OSHA requires or will accept.

3. Employee posting

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

J & S FABRICATIONS will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1898995 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1a (29 CFR 1910.95(c)(1))
  • Citation 1, Item 1b (29 CFR 1910.95(d)(1))
  • Citation 1, Item 1c (29 CFR 1910.95(g)(1))
  • Citation 1, Item 1d (29 CFR 1910.95(i)(2)(i))
  • Citation 1, Item 1e (29 CFR 1910.95(k)(1))
  • Citation 1, Item 2a (29 CFR 1910.147(c)(1))
  • Citation 1, Item 2b (29 CFR 1910.147(c)(4)(i))
  • Citation 1, Item 2c (29 CFR 1910.147(c)(7)(i))
  • Citation 2, Item 1a (29 CFR 1910.1200(e)(1))
  • Citation 2, Item 1b (29 CFR 1910.1200(h)(1))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

4. Where to send it

Where to send this

OSHA Harrisburg Area Office

Identified from the office code in the public record (0316700). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 10 items have been corrected, with the date and how
  • A check of your citation for the item the public record shows as corrected during the inspection. If the citation notes it, mark it: no certification is needed for that item (29 CFR 1903.19(c)(2))
  • Verification of 9 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
  • The name and title of the person signing
  • Signature of the employer or an authorized representative
  • Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
  • Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
  • No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
  • No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
  • Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
  • The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
  • 29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.