330 LEE ROAD 456, PHENIX CITY, AL 36867 · OSHA inspection 1901143 · citation issued Sep 8, 2026 · prepared Sunday, November 22, 2026
Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.
1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Mobile Area Office Address: as printed on your citation
T-N-T CUSTOM BUILT CABINETS, INC. 330 LEE ROAD 456, PHENIX CITY, AL 36867
The hazards referenced in Inspection Number 1901143 for the violations identified below were corrected as follows:
Citation 1, Item 1a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 1b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 2a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 2b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 2c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 2d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 3a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 3b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 3c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
Oct 6, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 6, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written certification of the PPE hazard assessment · Plain-English summary, not legal advice
The hazard assessment must be confirmed by a written certification that names the workplace evaluated, the person certifying it and the date(s) of the assessment, and identifies the document as a certification of hazard assessment.
Oct 6, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is October 6, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Written PPE hazard assessment certification
Purchase record for the protective equipment
Training roster
Suggestions only, not a statement of what OSHA requires or will accept.
Written respiratory protection program · Plain-English summary, not legal advice
Where respirators are needed to protect employees' health, or the employer requires them, there must be a written respiratory protection program with worksite-specific procedures that is put into practice and updated when conditions change. It covers, as applicable, respirator selection, medical evaluations, fit testing, use, maintenance, air quality, training and program evaluation.
Medical evaluation for respirator use · Plain-English summary, not legal advice
Before an employee is fit tested or required to use a respirator at work, the employer must provide a medical evaluation of the employee's ability to use a respirator.
Written hazard communication program · Plain-English summary, not legal advice
Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.
Written hazard communication program · Plain-English summary, not legal advice
Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.
Other-than-serious item under 29 CFR 1910.1200(g)(1)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
T-N-T CUSTOM BUILT CABINETS, INC. will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1901143 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Citation 1, Item 1a (29 CFR 1910.107(c)(6))
Citation 1, Item 1b (29 CFR 1910.107(c)(7))
Citation 2, Item 1 (29 CFR 1910.132(d)(2))
Citation 2, Item 2a (29 CFR 1910.134(c)(1))
Citation 2, Item 2b (29 CFR 1910.134(e)(1))
Citation 2, Item 2c (29 CFR 1910.134(f)(1))
Citation 2, Item 2d (29 CFR 1910.134(k)(3))
Citation 2, Item 3a (29 CFR 1910.1200(e)(1))
Citation 2, Item 3b (29 CFR 1910.1200(e)(1)(i))
Citation 2, Item 3c (29 CFR 1910.1200(g)(1))
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Mobile Area Office
Identified from the office code in the public record (0418600). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 10 items have been corrected, with the date and how
Verification of 2 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.