Skip to content

Abatement packet · DRAFT — PREVIEW

HAYSITE REINFORCED PLASTICS, LLC

5599 NEW PERRY HWY, ERIE, PA 16509 · OSHA inspection 1901591 · citation issued Oct 7, 2026 · prepared Sunday, November 22, 2026

Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.

1. Certification letter

Abatement certification · draft

To: Area Director, OSHA Erie Area Office
Address: as printed on your citation

HAYSITE REINFORCED PLASTICS, LLC
5599 NEW PERRY HWY, ERIE, PA 16509

The hazards referenced in Inspection Number 1901591 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 1d was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  3. Citation 1, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  4. Citation 2, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  5. Citation 2, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

2. Item-by-item closeout

Citation 1 · Item 1c · 29 CFR 1910.147(c)(4)(ii)(B) · Serious

Written lockout/tagout procedures · Plain-English summary, not legal advice

Procedures for controlling hazardous energy must be written down and used whenever employees service or maintain machines (a limited exception applies when a machine meets every listed condition). The procedures must clearly set out their scope, purpose, authorization, rules and the steps for shutting down, isolating, blocking and securing the machine, placing and removing locks or tags, and checking that the energy is controlled.

Official text

Nov 3, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 30, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 3, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written energy-control (lockout/tagout) procedure for the machine
  • Training roster for authorized and affected employees
  • Record of the periodic inspection of the procedure
  • Photo of the lockout points and locks or tags

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 1d · 29 CFR 1910.145(c)(3) · Serious

Serious item under 29 CFR 1910.145(c)(3)

Nov 3, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 30, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 3, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the corrected condition
  • Repair invoice, receipt or work order
  • Training roster, if employees were trained
  • Written program or procedure page, if one was changed

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2 · 29 CFR 1910.212(a)(3)(ii) · Serious

Point-of-operation guarding · Plain-English summary, not legal advice

Where a machine's point of operation (the area where work is done on the material) could injure an employee, it must be guarded so the operator cannot put any part of the body in the danger zone during the operating cycle. Hand tools for placing material can add protection but cannot replace guarding.

Official text

Feb 16, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on October 30, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from November 3, 2026, as issued, to February 16, 2027.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the installed guard on the machine
  • Invoice or work order for the guard or repair
  • Equipment service record

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 2 · Item 1 · 29 CFR 1904.29(b)(1) · Other-than-serious

Other-than-serious item under 29 CFR 1904.29(b)(1)

Verification required. No abatement date in the public record. Use the date on your citation.

Public record: Recorded in the public data as corrected during the inspection.

Not yet confirmed by the employer. Nothing is certified for this item.

The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).

Evidence on file: 0 files

Possible supporting evidence

  • Corrected OSHA 300 log page
  • Corrected or posted OSHA 300A summary
  • Record of the electronic submission if one was required

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 2 · Item 2 · 29 CFR 1910.147(c)(7)(iv) · Other-than-serious

Lockout/tagout training · Plain-English summary, not legal advice

Employees must be trained so the energy control program is understood: authorized employees on recognizing and isolating hazardous energy, affected employees on the purpose and use of the procedures, and others in the area about the procedures. Retraining is required when jobs, machines or procedures change, and training must be certified in writing with each employee's name and dates.

Official text

Nov 3, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on October 30, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 3, 2026.

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Page of your written energy-control (lockout/tagout) procedure for the machine
  • Training roster for authorized and affected employees
  • Record of the periodic inspection of the procedure
  • Photo of the lockout points and locks or tags

Suggestions only, not a statement of what OSHA requires or will accept.

3. Employee posting

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

HAYSITE REINFORCED PLASTICS, LLC will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1901591 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1c (29 CFR 1910.147(c)(4)(ii)(B))
  • Citation 1, Item 1d (29 CFR 1910.145(c)(3))
  • Citation 1, Item 2 (29 CFR 1910.212(a)(3)(ii))
  • Citation 2, Item 1 (29 CFR 1904.29(b)(1))
  • Citation 2, Item 2 (29 CFR 1910.147(c)(7)(iv))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

4. Where to send it

Where to send this

OSHA Erie Area Office

Identified from the office code in the public record (0336000). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 5 items have been corrected, with the date and how
  • A check of your citation for the item the public record shows as corrected during the inspection. If the citation notes it, mark it: no certification is needed for that item (29 CFR 1903.19(c)(2))
  • Verification of 4 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
  • The name and title of the person signing
  • Signature of the employer or an authorized representative
  • Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
  • Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
  • No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
  • No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
  • Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
  • The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
  • 29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.