1. Certification letter

Abatement certification · draft

To: Area Director, OSHA Billings Area Office
Address: as printed on your citation

JB CONSTRUCTION
7 PROSPECT DRIVE, BILLINGS, MT 59102

The hazards referenced in Inspection Number 1919952 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

2. Item-by-item closeout

Citation 1 · Item 1 · 29 CFR 1926.501(b)(13) · Serious

Fall protection in residential construction · Plain-English summary, not legal advice

Each employee doing residential construction work 6 feet or more above a lower level must be protected by guardrails, a safety net or a personal fall arrest system, unless another provision allows something else. If the employer can show those systems are infeasible or create a greater hazard, a written fall protection plan meeting 1926.502(k) is required instead.

Official text

Nov 9, 2026 per the public record · certification generally due Nov 19, 2026 (estimate)

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the fall protection in place
  • Fall protection training certification (1926.503)
  • Invoice for guardrails, nets or personal fall arrest equipment

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

Citation 1 · Item 2 · 29 CFR 1926.1053(b)(1) · Serious

Ladder extending above the landing · Plain-English summary, not legal advice

When a portable ladder is used to reach an upper landing, its side rails must extend at least 3 feet above the landing. If the ladder is too short for that, it must be secured at the top to a rigid support and a grabrail or other grasping device must be provided.

Official text

Nov 9, 2026 per the public record · certification generally due Nov 19, 2026 (estimate)

Public record: No abatement completion recorded in the public data.

Not yet confirmed by the employer. Nothing is certified for this item.

Evidence on file: 0 files

Possible supporting evidence

  • Photo of the corrected condition
  • Repair invoice, receipt or work order
  • Training roster, if employees were trained
  • Written program or procedure page, if one was changed

Serious item: attach documents if your citation says they are required (1903.19(d)).

Suggestions only, not a statement of what OSHA requires or will accept.

3. Employee posting

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

JB CONSTRUCTION will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1919952 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1 (29 CFR 1926.501(b)(13))
  • Citation 1, Item 2 (29 CFR 1926.1053(b)(1))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

4. Where to send it

Where to send this

OSHA Billings Area Office

Identified from the office code in the public record (0830100). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 2 items have been corrected, with the date and how
  • The name and title of the person signing
  • Signature of the employer or an authorized representative
  • Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
  • Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
  • No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
  • No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
  • Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
  • The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
  • 29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.