600 MAIN STREET, HARTFORD, CT 06103 · OSHA inspection 1879695 · citation issued Aug 3, 2026 · prepared Sunday, November 22, 2026
Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.
1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Hartford Area Office Address: as printed on your citation
WADSWORTH ATHENEUM MUSEUM OF ART 600 MAIN STREET, HARTFORD, CT 06103
The hazards referenced in Inspection Number 1879695 for the violations identified below were corrected as follows:
Citation 1, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3e was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 5a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 5b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 6a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 6b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 7a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 7b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 7c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 8a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 8b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 8c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 8d was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 8e was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 9a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 9b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 9c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 10a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 10b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 2 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 3 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 4 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 5 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 6 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 7 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 8 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 9 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 10 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 11 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
2. Item-by-item closeout
Citation 1 · Item 1 · 29 CFR 1910.22(c) · Serious
Serious item under 29 CFR 1910.22(c)
Sep 18, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected walking-working surface, railing or ladder
Invoice for repair or replacement
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Fall protection at unprotected sides and edges · Plain-English summary, not legal advice
Each employee on a walking-working surface with an unprotected side or edge 4 feet or more above a lower level must be protected by guardrails, a safety net, or a personal fall protection system (fall arrest, travel restraint or positioning), except where the section provides otherwise.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected walking-working surface, railing or ladder
Invoice for repair or replacement
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Sep 18, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
PPE hazard assessment · Plain-English summary, not legal advice
The employer must assess the workplace for hazards that call for personal protective equipment. Where such hazards exist, the employer must select the right PPE, have each affected employee use it, tell them about the selection, and make sure it fits each person.
Mar 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Written PPE hazard assessment certification
Purchase record for the protective equipment
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Written PPE hazard assessment certification
Purchase record for the protective equipment
Training roster
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected first-aid or sanitation provision
Purchase record
Inspection record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Machine guarding · Plain-English summary, not legal advice
One or more methods of machine guarding must protect the operator and other employees in the machine area from hazards such as the point of operation, ingoing nip points, rotating parts, and flying chips and sparks. Barrier guards, two-hand tripping devices and electronic safety devices are examples.
Sep 20, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to September 20, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Sep 20, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to September 20, 2027.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Sep 18, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Sep 18, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written hazard communication program · Plain-English summary, not legal advice
Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.
Mar 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Hazard communication training · Plain-English summary, not legal advice
Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.
Mar 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1904.32(a)(4)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Corrected OSHA 300 log page
Corrected or posted OSHA 300A summary
Record of the electronic submission if one was required
Suggestions only, not a statement of what OSHA requires or will accept.
Electronic submission of the OSHA 300A summary · Plain-English summary, not legal advice
Establishments with 20 to 249 employees in industries listed in Appendix A to subpart E, and establishments with 250 or more employees that must keep injury records, must submit the information from their OSHA Form 300A summary to OSHA electronically once a year, by March 2 of the year after the year the form covers.
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Corrected OSHA 300 log page
Corrected or posted OSHA 300A summary
Record of the electronic submission if one was required
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.37(a)(4)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.37(b)(7)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the cleared or marked exit route
Page of your emergency action or fire prevention plan
Training roster
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.146(c)(2)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.178(l)(4)(iii)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Operator training and evaluation certificates
Daily truck inspection checklist
Repair invoice if the truck was fixed or taken out of service
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.303(g)(1)(ii)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.1001(j)(3)(i)
Mar 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.1001(j)(4)(iv)
Mar 31, 2027 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.
Public record: No abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
Other-than-serious item under 29 CFR 1910.1001(k)(1)
Verification required. No abatement date in the public record. Use the date on your citation.
Public record: Recorded in the public data as corrected during the inspection.
Not yet confirmed by the employer. Nothing is certified for this item.
The public record shows this item as corrected during the inspection. If your citation notes that, no certification is needed for it (29 CFR 1903.19(c)(2)).
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected condition
Repair invoice, receipt or work order
Training roster, if employees were trained
Written program or procedure page, if one was changed
Suggestions only, not a statement of what OSHA requires or will accept.
Labels on workplace containers · Plain-English summary, not legal advice
Each container of a hazardous chemical in the workplace must be labeled, tagged or marked, either with the full label information required on shipped containers or with the product identifier plus words, pictures or symbols giving at least general information about its hazards. Some exceptions apply to stationary and portable containers.
Sep 18, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
WADSWORTH ATHENEUM MUSEUM OF ART will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1879695 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Hartford Area Office
Identified from the office code in the public record (0112000). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 38 items have been corrected, with the date and how
A check of your citation for the 26 items the public record shows as corrected during the inspection. If the citation notes it, mark it: no certification is needed for those items (29 CFR 1903.19(c)(2))
Verification of 12 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.