Prepared from the public OSHA recordRetrieved Nov 21, 2026

Wadsworth Atheneum Museum of ArtInspection #1879695 — 38 citation items

HARTFORD, CT · Citation issued Aug 3, 2026

Your OSHA case preview Free · from the public OSHA record

Inspection
#1879695
Citation items
3827 Serious · 11 Other-than-serious
Abatement dates
Sep 18, 2026 – Sep 20, 2027Per the public record · 38 to verify against your copy
Citation status public record
6 of 38 with no completion recordedYour certification is generally due within 10 days after each abatement date
Evidence sections
38 item foldersSuggested: Photos · Invoices and receipts · Training records · Written programs · Inspection and test records

Verification required before any date is estimated

The public record shows a contest, settlement or other change, or no usable date, for 6 items. Check each item below against your citation, settlement or final order.

CiteClock estimates a certification date only from a Federal OSHA abatement date that nothing in the public record changes. If a settlement or agreement changed your dates, use those.

Your abatement packet is already drafted.

Your case, organized

  1. What the inspection contains Public record

    38 cited items under 29 CFR 1910.22(c), 29 CFR 1910.28(b)(1)(i), 29 CFR 1910.36(b)(1) and 35 more, issued Aug 3, 2026 by OSHA Hartford Area Office.

  2. What you'll document From you

    For each item you have corrected: the date, what was done, and a photo or record that shows it. Then your signature on the certification. Nothing is confirmed for you.

  3. How CiteClock structures it Already drafted

    One section per item with suggested evidence (for example: “Photo of the corrected walking-working surface, railing or ladder”), the certification letter in OSHA's sample format, the employee posting and where to send it. See the free draft PDF.

  4. After you unlock

    Confirm each corrected item, add photos and files from your phone, keep everything in one private case, and download the finished packet without the DRAFT mark.

Item by item

CiteClock prepared each item from the public record. After you buy, you confirm each one with the date and what you did, and add a photo.

  1. Citation 1 · Item 129 CFR 1910.22(c)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.22(c)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected walking-working surface, railing or ladder
    • Invoice for repair or replacement
    • Inspection record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  2. Citation 1 · Item 229 CFR 1910.28(b)(1)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Fall protection at unprotected sides and edges · Plain-English summary, not legal advice

    Each employee on a walking-working surface with an unprotected side or edge 4 feet or more above a lower level must be protected by guardrails, a safety net, or a personal fall protection system (fall arrest, travel restraint or positioning), except where the section provides otherwise.

    Official text

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected walking-working surface, railing or ladder
    • Invoice for repair or replacement
    • Inspection record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  3. Citation 1 · Item 3a29 CFR 1910.36(b)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.36(b)(1)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  4. Citation 1 · Item 3b29 CFR 1910.36(g)(2)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.36(g)(2)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  5. Citation 1 · Item 3c29 CFR 1910.37(b)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.37(b)(1)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  6. Citation 1 · Item 3d29 CFR 1910.37(b)(2)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.37(b)(2)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  7. Citation 1 · Item 3e29 CFR 1910.37(b)(5)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.37(b)(5)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  8. Citation 1 · Item 4a29 CFR 1910.132(d)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    PPE hazard assessment · Plain-English summary, not legal advice

    The employer must assess the workplace for hazards that call for personal protective equipment. Where such hazards exist, the employer must select the right PPE, have each affected employee use it, tell them about the selection, and make sure it fits each person.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Written PPE hazard assessment certification
    • Purchase record for the protective equipment
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  9. Citation 1 · Item 4b29 CFR 1910.133(a)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.133(a)(1)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Written PPE hazard assessment certification
    • Purchase record for the protective equipment
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  10. Citation 1 · Item 4c29 CFR 1910.151(c)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.151(c)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected first-aid or sanitation provision
    • Purchase record
    • Inspection record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  11. Citation 1 · Item 5a29 CFR 1910.212(a)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Machine guarding · Plain-English summary, not legal advice

    One or more methods of machine guarding must protect the operator and other employees in the machine area from hazards such as the point of operation, ingoing nip points, rotating parts, and flying chips and sparks. Barrier guards, two-hand tripping devices and electronic safety devices are examples.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to September 20, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  12. Citation 1 · Item 5b29 CFR 1910.219(e)(3)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.219(e)(3)(i)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  13. Citation 1 · Item 6a29 CFR 1910.213(b)(3)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.213(b)(3)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  14. Citation 1 · Item 6b29 CFR 1910.213(d)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.213(d)(1)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  15. Citation 1 · Item 7a29 CFR 1910.303(b)(1)(vi)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.303(b)(1)(vi)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  16. Citation 1 · Item 7b29 CFR 1910.303(g)(2)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.303(g)(2)(i)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to September 20, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  17. Citation 1 · Item 7c29 CFR 1910.304(g)(5)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.304(g)(5)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  18. Citation 1 · Item 8a29 CFR 1910.303(b)(2)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.303(b)(2)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  19. Citation 1 · Item 8b29 CFR 1910.304(b)(4)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.304(b)(4)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  20. Citation 1 · Item 8c29 CFR 1910.304(b)(4)(ii)(B)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.304(b)(4)(ii)(B)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  21. Citation 1 · Item 8d29 CFR 1910.305(g)(1)(iv)(A)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(g)(1)(iv)(A)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  22. Citation 1 · Item 8e29 CFR 1910.305(j)(2)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(j)(2)(i)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  23. Citation 1 · Item 9a29 CFR 1910.305(b)(1)(ii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(b)(1)(ii)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  24. Citation 1 · Item 9b29 CFR 1910.305(b)(2)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(b)(2)(i)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  25. Citation 1 · Item 9c29 CFR 1910.334(a)(2)(ii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.334(a)(2)(ii)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  26. Citation 1 · Item 10a29 CFR 1910.1200(e)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Written hazard communication program · Plain-English summary, not legal advice

    Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written hazard communication program
    • Safety data sheet index or binder page
    • Training roster with date and topics
    • Photo of the corrected container labels

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  27. Citation 1 · Item 10b29 CFR 1910.1200(h)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Hazard communication training · Plain-English summary, not legal advice

    Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written hazard communication program
    • Safety data sheet index or binder page
    • Training roster with date and topics
    • Photo of the corrected container labels

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  28. Citation 2 · Item 129 CFR 1904.32(a)(4)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1904.32(a)(4)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Corrected OSHA 300 log page
    • Corrected or posted OSHA 300A summary
    • Record of the electronic submission if one was required

    Suggestions only, not a statement of what OSHA requires or will accept.

  29. Citation 2 · Item 229 CFR 1904.41(a)(1)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Electronic submission of the OSHA 300A summary · Plain-English summary, not legal advice

    Establishments with 20 to 249 employees in industries listed in Appendix A to subpart E, and establishments with 250 or more employees that must keep injury records, must submit the information from their OSHA Form 300A summary to OSHA electronically once a year, by March 2 of the year after the year the form covers.

    Official text

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Corrected OSHA 300 log page
    • Corrected or posted OSHA 300A summary
    • Record of the electronic submission if one was required

    Suggestions only, not a statement of what OSHA requires or will accept.

  30. Citation 2 · Item 329 CFR 1910.37(a)(4)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.37(a)(4)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Suggestions only, not a statement of what OSHA requires or will accept.

  31. Citation 2 · Item 429 CFR 1910.37(b)(7)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.37(b)(7)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Suggestions only, not a statement of what OSHA requires or will accept.

  32. Citation 2 · Item 529 CFR 1910.146(c)(2)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.146(c)(2)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Suggestions only, not a statement of what OSHA requires or will accept.

  33. Citation 2 · Item 629 CFR 1910.178(l)(4)(iii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.178(l)(4)(iii)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Operator training and evaluation certificates
    • Daily truck inspection checklist
    • Repair invoice if the truck was fixed or taken out of service

    Suggestions only, not a statement of what OSHA requires or will accept.

  34. Citation 2 · Item 729 CFR 1910.303(g)(1)(ii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.303(g)(1)(ii)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Suggestions only, not a statement of what OSHA requires or will accept.

  35. Citation 2 · Item 829 CFR 1910.1001(j)(3)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.1001(j)(3)(i)

    What the public record says

    Other-than-serious · No abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Suggestions only, not a statement of what OSHA requires or will accept.

  36. Citation 2 · Item 929 CFR 1910.1001(j)(4)(iv)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.1001(j)(4)(iv)

    What the public record says

    Other-than-serious · No abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The record's abatement date changed from September 18, 2026, as issued, to March 31, 2027.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Suggestions only, not a statement of what OSHA requires or will accept.

  37. Citation 2 · Item 1029 CFR 1910.1001(k)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1910.1001(k)(1)

    What the public record says

    Other-than-serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The public record has no abatement date for this item.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Suggestions only, not a statement of what OSHA requires or will accept.

  38. Citation 2 · Item 1129 CFR 1910.1200(f)(6)(ii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Labels on workplace containers · Plain-English summary, not legal advice

    Each container of a hazardous chemical in the workplace must be labeled, tagged or marked, either with the full label information required on shipped containers or with the product identifier plus words, pictures or symbols giving at least general information about its hazards. Some exceptions apply to stationary and portable containers.

    Official text

    What the public record says

    Other-than-serious · Abatement completion recorded in the public data

    Verification required Needs review

    Informal settlement on August 28, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is September 18, 2026.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written hazard communication program
    • Safety data sheet index or binder page
    • Training roster with date and topics
    • Photo of the corrected container labels

    Suggestions only, not a statement of what OSHA requires or will accept.

Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19). If a settlement changed your dates, use those. 29 CFR 1903.19

The packet, drafted

This is the draft for Wadsworth Atheneum Museum of Art. It stays marked DRAFT — PREVIEW until you confirm each item; the signature is always yours.

Abatement certification · draft

To: Area Director, OSHA Hartford Area Office
Address: as printed on your citation

WADSWORTH ATHENEUM MUSEUM OF ART
600 MAIN STREET, HARTFORD, CT 06103

The hazards referenced in Inspection Number 1879695 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  3. Citation 1, Item 3a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  4. Citation 1, Item 3b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  5. Citation 1, Item 3c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  6. Citation 1, Item 3d was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  7. Citation 1, Item 3e was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  8. Citation 1, Item 4a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  9. Citation 1, Item 4b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  10. Citation 1, Item 4c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  11. Citation 1, Item 5a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  12. Citation 1, Item 5b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  13. Citation 1, Item 6a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  14. Citation 1, Item 6b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  15. Citation 1, Item 7a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  16. Citation 1, Item 7b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  17. Citation 1, Item 7c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  18. Citation 1, Item 8a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  19. Citation 1, Item 8b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  20. Citation 1, Item 8c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  21. Citation 1, Item 8d was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  22. Citation 1, Item 8e was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  23. Citation 1, Item 9a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  24. Citation 1, Item 9b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  25. Citation 1, Item 9c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  26. Citation 1, Item 10a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  27. Citation 1, Item 10b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  28. Citation 2, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  29. Citation 2, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  30. Citation 2, Item 3 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  31. Citation 2, Item 4 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  32. Citation 2, Item 5 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  33. Citation 2, Item 6 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  34. Citation 2, Item 7 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  35. Citation 2, Item 8 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  36. Citation 2, Item 9 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  37. Citation 2, Item 10 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  38. Citation 2, Item 11 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

WADSWORTH ATHENEUM MUSEUM OF ART will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1879695 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1 (29 CFR 1910.22(c))
  • Citation 1, Item 2 (29 CFR 1910.28(b)(1)(i))
  • Citation 1, Item 3a (29 CFR 1910.36(b)(1))
  • Citation 1, Item 3b (29 CFR 1910.36(g)(2))
  • Citation 1, Item 3c (29 CFR 1910.37(b)(1))
  • Citation 1, Item 3d (29 CFR 1910.37(b)(2))
  • Citation 1, Item 3e (29 CFR 1910.37(b)(5))
  • Citation 1, Item 4a (29 CFR 1910.132(d)(1))
  • Citation 1, Item 4b (29 CFR 1910.133(a)(1))
  • Citation 1, Item 4c (29 CFR 1910.151(c))
  • Citation 1, Item 5a (29 CFR 1910.212(a)(1))
  • Citation 1, Item 5b (29 CFR 1910.219(e)(3)(i))
  • Citation 1, Item 6a (29 CFR 1910.213(b)(3))
  • Citation 1, Item 6b (29 CFR 1910.213(d)(1))
  • Citation 1, Item 7a (29 CFR 1910.303(b)(1)(vi))
  • Citation 1, Item 7b (29 CFR 1910.303(g)(2)(i))
  • Citation 1, Item 7c (29 CFR 1910.304(g)(5))
  • Citation 1, Item 8a (29 CFR 1910.303(b)(2))
  • Citation 1, Item 8b (29 CFR 1910.304(b)(4))
  • Citation 1, Item 8c (29 CFR 1910.304(b)(4)(ii)(B))
  • Citation 1, Item 8d (29 CFR 1910.305(g)(1)(iv)(A))
  • Citation 1, Item 8e (29 CFR 1910.305(j)(2)(i))
  • Citation 1, Item 9a (29 CFR 1910.305(b)(1)(ii))
  • Citation 1, Item 9b (29 CFR 1910.305(b)(2)(i))
  • Citation 1, Item 9c (29 CFR 1910.334(a)(2)(ii))
  • Citation 1, Item 10a (29 CFR 1910.1200(e)(1))
  • Citation 1, Item 10b (29 CFR 1910.1200(h)(1))
  • Citation 2, Item 1 (29 CFR 1904.32(a)(4))
  • Citation 2, Item 2 (29 CFR 1904.41(a)(1)(i))
  • Citation 2, Item 3 (29 CFR 1910.37(a)(4))
  • Citation 2, Item 4 (29 CFR 1910.37(b)(7))
  • Citation 2, Item 5 (29 CFR 1910.146(c)(2))
  • Citation 2, Item 6 (29 CFR 1910.178(l)(4)(iii))
  • Citation 2, Item 7 (29 CFR 1910.303(g)(1)(ii))
  • Citation 2, Item 8 (29 CFR 1910.1001(j)(3)(i))
  • Citation 2, Item 9 (29 CFR 1910.1001(j)(4)(iv))
  • Citation 2, Item 10 (29 CFR 1910.1001(k)(1))
  • Citation 2, Item 11 (29 CFR 1910.1200(f)(6)(ii))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

Where to send this

OSHA Hartford Area Office

Identified from the office code in the public record (0112000). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 38 items have been corrected, with the date and how
  • A check of your citation for the 26 items the public record shows as corrected during the inspection. If the citation notes it, mark it: no certification is needed for those items (29 CFR 1903.19(c)(2))
  • Verification of 12 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
  • The name and title of the person signing
  • Signature of the employer or an authorized representative

Unlock this case

One-time payment per case. No subscription or scheduled renewal. Access continues while CiteClock operates, subject to the Terms of Service. Sales tax or VAT may be added at checkout where applicable.

Free preview

Free

You are looking at it.

  • Certification letter, item-by-item closeout and employee posting, drafted
  • Every item with its abatement date per the public record
  • Draft PDF marked DRAFT — PREVIEW

Self-Serve

$49 one time per case

A clear path from citation to a clean closeout packet, for one person.

  • One case · one user
  • Citation management and deadlines
  • Your own photos, PDFs and evidence
  • Missing-document checklist
  • Clean PDF and ZIP exports
  • Basic case history
Start Free — $49 at Export

COMMAND

$149 one time per case

Keep corrective work moving, from assignment to the next inspection.

  • Everything in Self-Serve
  • Up to 5 users on this case, including you
  • Corrective-action planning and task assignments
  • Secure worker evidence requests
  • Supervisor review and approval
  • Full audit history
  • Follow-up reminders and evidence checks
Unlock with COMMAND — $149
Exactly what the plan includes What you provide, what CiteClock drafts, what evidence the rule asks for and who signs
For this caseSelf-Serve $49 one time per caseCOMMAND $149 one time per case
What you provide
  • The facts from your citation and the dates you confirm.
  • What was corrected and when, in your own words, with supporting files.
  • The name and title of the person who signs.
  • The facts from your citation and the dates you confirm.
  • What was corrected and when, in your own words, with supporting files.
  • The name and title of the person who signs.
What CiteClock does
  • Software only: it does not read your photos, decide whether an item is fixed or check your workplace.
  • Organizes citation items, dates and your evidence.
  • Lists missing documents and builds clean PDF/ZIP outputs.
  • Keeps basic case history. One user on this case.
  • Software only: it does not read your photos, decide whether an item is fixed or check your workplace.
  • Organizes citation items, dates and your evidence.
  • Lists missing documents and builds clean PDF/ZIP outputs.
  • Adds draft corrective-action plans for you to review (drafted with AI; you decide what is kept), assignments, worker evidence links and supervisor approvals.
  • Keeps the full audit trail and schedules follow-up evidence checks.
  • Up to 5 people on this case, including its owner.
When it is ready
  • Work at your own pace. Download when you are ready.
  • Coordinate the work at your team’s pace. Download when you are ready.

Access continues while CiteClock operates, subject to the Terms of Service. Sales tax or VAT may be added at checkout where applicable. The $100 upgrade to COMMAND keeps the case's existing access terms. No subscription or scheduled renewal.

What evidence the rule asks for

  • Every item you certify: the date it was corrected and how (29 CFR 1903.19(c)).
  • Willful and repeat items: documents showing the correction, such as photos, receipts or training records (1903.19(d)).
  • Serious items: the same documents when your citation says so (1903.19(d)).
  • Other items: the rule does not require documents. A photo or record kept with the packet is optional.
  • Abatement plans and progress reports: only when your citation asks for them (1903.19(e) and (f)).

Read 29 CFR 1903.19

What you get

  • One PDF to sign and send: cover, items at a glance, the certification letter in the layout of OSHA's Appendix A sample (only the items you confirmed), each item with its files after it, the employee posting, where to send it and an evidence index.
  • Abatement plan and progress report forms in the Appendix B layout, when your citation requires them.
  • Your private case and archive: every file, confirmation and packet you send, kept with its date.

See a completed sample packet

Who verifies and signs

  • You confirm every fact. CiteClock never marks an item corrected for you.
  • The employer or an authorized representative signs the letter, sends the packet to the OSHA Area Office on the citation and posts the employee notice.
  • CiteClock lists what is missing. It cannot confirm a hazard was fixed, and it never signs, certifies or files anything with OSHA.

Not included

  • Legal advice, contesting or negotiating the citation, or dealing with OSHA for you. CiteClock is independent software, not a law firm, and not affiliated with OSHA.

You end with a packet like this one: See a completed sample packet

Your team does the corrective work. CiteClock keeps the tasks, evidence requests and closeout records together in one case.

Secure checkout by Paddle, our merchant of record. Organizing is free: sign in with your email and start. When you want the clean exports, confirm when the citation arrived, then pay. Full refund within 14 days.

Secure Checkout by Paddle. Billing note: Your purchase is for CiteClock. Paddle processes the payment as Merchant of Record. The operator’s registered name, Quote reclaim, may appear at checkout. Questions? hello@citeclock.com.

About CiteClock

CiteClock Support
Independent software for OSHA abatement closeouts

CiteClock was built so an employer can close out a citation without paying for hours of someone sorting files. The draft above was prepared from the public record before you arrived. Questions about your case? A person at CiteClock reads every message: hello@citeclock.com

  • Public data only on this page. Everything here comes from the U.S. Department of Labor's public enforcement data. Privacy · Terms
  • Your files stay private. Photos and documents you add go to your private case, never to this page. No third-party tracking pixels or ad trackers.
  • You stay in control. You confirm every item and sign the certification. CiteClock never certifies anything for you.
  • Refunds and support. Full refund within 14 days. Refund policy · hello@citeclock.com

Independent software. Not affiliated with OSHA. Not legal advice. CiteClock does not predict outcomes or penalty changes, and it does not sign or file anything with OSHA.

Standards cited in this inspection

Full citation text from the public record

38 items, as published
  • Citation 1 · Item 1

    Walking-working surfaces

    $5,426proposed

    Serious29 CFR 1910.22(c)Correct by Sep 18, 2026
    What this standard covers

    General requirements for walking-working surfaces such as floors, aisles and walkways.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100022 C

    Read the official standard
  • Citation 1 · Item 2

    Duty to have fall protection

    $9,045proposed

    Serious29 CFR 1910.28(b)(1)(i)Correction date: see your citation
    What this standard covers

    Duties to have fall protection and falling-object protection in general industry.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100028 B01 I

    Read the official standard
  • Citation 1 · Item 3a

    Exit route design and construction

    $5,426proposed

    Serious29 CFR 1910.36(b)(1)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100036 B01

    Read the official standard
  • Citation 1 · Item 3b

    Exit route design and construction

    $0proposed

    Serious29 CFR 1910.36(g)(2)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100036 G02

    Read the official standard
  • Citation 1 · Item 3c

    Exit routes: maintenance and safeguards

    $0proposed

    Serious29 CFR 1910.37(b)(1)Correct by Sep 18, 2026
    What this standard covers

    Maintenance, safeguards and operational features for exit routes.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100037 B01

    Read the official standard
  • Citation 1 · Item 3d

    Exit routes: maintenance and safeguards

    $0proposed

    Serious29 CFR 1910.37(b)(2)Correction date: see your citation
    What this standard covers

    Maintenance, safeguards and operational features for exit routes.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100037 B02

    Read the official standard
  • Citation 1 · Item 3e

    Exit routes: maintenance and safeguards

    $0proposed

    Serious29 CFR 1910.37(b)(5)Correction date: see your citation
    What this standard covers

    Maintenance, safeguards and operational features for exit routes.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100037 B05

    Read the official standard
  • Citation 1 · Item 4a

    Personal protective equipment

    $9,045proposed

    Serious29 CFR 1910.132(d)(1)Correct by Mar 31, 2027
    What this standard covers

    General requirements for personal protective equipment, including hazard assessment and training.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100132 D01

    Read the official standard
  • Citation 1 · Item 4b

    Eye and face protection

    $0proposed

    Serious29 CFR 1910.133(a)(1)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100133 A01

    Read the official standard
  • Citation 1 · Item 4c

    Medical services and first aid

    $0proposed

    Serious29 CFR 1910.151(c)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100151 C

    Read the official standard
  • Citation 1 · Item 5a

    Machine guarding

    $9,045proposed

    Serious29 CFR 1910.212(a)(1)Correct by Sep 20, 2027
    What this standard covers

    General requirements for guarding machines against hazards from operation and moving parts.

    Records you may want to gather

    • Dated photographs of the identified equipment
    • Existing guard inspection records
    • Repair receipts or corrective-work records, if any

    As published in the public record

    19100212 A01

    Read the official standard
  • Citation 1 · Item 5b

    Mechanical power-transmission guarding

    $0proposed

    Serious29 CFR 1910.219(e)(3)(i)Correction date: see your citation
    What this standard covers

    Guarding of mechanical power-transmission apparatus.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100219 E03 I

    Read the official standard
  • Citation 1 · Item 6a

    Woodworking machinery

    $9,045proposed

    Serious29 CFR 1910.213(b)(3)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100213 B03

    Read the official standard
  • Citation 1 · Item 6b

    Woodworking machinery

    $0proposed

    Serious29 CFR 1910.213(d)(1)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100213 D01

    Read the official standard
  • Citation 1 · Item 7a

    Electrical: general requirements

    $7,235proposed

    Serious29 CFR 1910.303(b)(1)(vi)Correction date: see your citation
    What this standard covers

    General requirements for electrical installations and equipment.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100303 B01 VI

    Read the official standard
  • Citation 1 · Item 7b

    Electrical: general requirements

    $0proposed

    Serious29 CFR 1910.303(g)(2)(i)Correct by Sep 20, 2027
    What this standard covers

    General requirements for electrical installations and equipment.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100303 G02 I

    Read the official standard
  • Citation 1 · Item 7c

    Electrical wiring design and protection

    $0proposed

    Serious29 CFR 1910.304(g)(5)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100304 G05

    Read the official standard
  • Citation 1 · Item 8a

    Electrical: general requirements

    $5,426proposed

    Serious29 CFR 1910.303(b)(2)Correction date: see your citation
    What this standard covers

    General requirements for electrical installations and equipment.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100303 B02

    Read the official standard
  • Citation 1 · Item 8b

    Electrical wiring design and protection

    $0proposed

    Serious29 CFR 1910.304(b)(4)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100304 B04

    Read the official standard
  • Citation 1 · Item 8c

    Electrical wiring design and protection

    $0proposed

    Serious29 CFR 1910.304(b)(4)(ii)(B)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100304 B04 II B

    Read the official standard
  • Citation 1 · Item 8d

    Electrical wiring methods and equipment

    $0proposed

    Serious29 CFR 1910.305(g)(1)(iv)(A)Correct by Sep 18, 2026
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 G01 IV A

    Read the official standard
  • Citation 1 · Item 8e

    Electrical wiring methods and equipment

    $0proposed

    Serious29 CFR 1910.305(j)(2)(i)Correction date: see your citation
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 J02 I

    Read the official standard
  • Citation 1 · Item 9a

    Electrical wiring methods and equipment

    $5,426proposed

    Serious29 CFR 1910.305(b)(1)(ii)Correction date: see your citation
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 B01 II

    Read the official standard
  • Citation 1 · Item 9b

    Electrical wiring methods and equipment

    $0proposed

    Serious29 CFR 1910.305(b)(2)(i)Correct by Sep 18, 2026
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 B02 I

    Read the official standard
  • Citation 1 · Item 9c

    Use of electrical equipment

    $0proposed

    Serious29 CFR 1910.334(a)(2)(ii)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100334 A02 II

    Read the official standard
  • Citation 1 · Item 10a

    Hazard communication

    $5,426proposed

    Serious29 CFR 1910.1200(e)(1)Correct by Mar 31, 2027
    What this standard covers

    Hazard communication, including chemical hazard information, labels, safety data sheets and training.

    Records you may want to gather

    • Existing written hazard communication program
    • Relevant safety data sheets and labels
    • Existing training records

    As published in the public record

    19101200 E01

    Read the official standard
  • Citation 1 · Item 10b

    Hazard communication

    $0proposed

    Serious29 CFR 1910.1200(h)(1)Correct by Mar 31, 2027
    What this standard covers

    Hazard communication, including chemical hazard information, labels, safety data sheets and training.

    Records you may want to gather

    • Existing written hazard communication program
    • Relevant safety data sheets and labels
    • Existing training records

    As published in the public record

    19101200 H01

    Read the official standard
  • Citation 2 · Item 1

    Annual summary of injuries and illnesses

    $1,808proposed

    Other-than-serious29 CFR 1904.32(a)(4)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19040032 A04

    Read the official standard
  • Citation 2 · Item 2

    Electronic submission of injury and illness records

    $1,808proposed

    Other-than-serious29 CFR 1904.41(a)(1)(i)Correction date: see your citation
    What this standard covers

    Electronic submission of workplace injury and illness records.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19040041 A01 I

    Read the official standard
  • Citation 2 · Item 3

    Exit routes: maintenance and safeguards

    $0proposed

    Other-than-serious29 CFR 1910.37(a)(4)Correction date: see your citation
    What this standard covers

    Maintenance, safeguards and operational features for exit routes.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100037 A04

    Read the official standard
  • Citation 2 · Item 4

    Exit routes: maintenance and safeguards

    $0proposed

    Other-than-serious29 CFR 1910.37(b)(7)Correction date: see your citation
    What this standard covers

    Maintenance, safeguards and operational features for exit routes.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100037 B07

    Read the official standard
  • Citation 2 · Item 5

    Permit-required confined spaces

    $0proposed

    Other-than-serious29 CFR 1910.146(c)(2)Correction date: see your citation
    What this standard covers

    Permit-required confined spaces.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100146 C02

    Read the official standard
  • Citation 2 · Item 6

    Powered industrial trucks (forklifts)

    $0proposed

    Other-than-serious29 CFR 1910.178(l)(4)(iii)Correction date: see your citation
    What this standard covers

    Powered industrial trucks (such as forklifts), including operator training and operation.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100178 L04 III

    Read the official standard
  • Citation 2 · Item 7

    Electrical: general requirements

    $0proposed

    Other-than-serious29 CFR 1910.303(g)(1)(ii)Correction date: see your citation
    What this standard covers

    General requirements for electrical installations and equipment.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100303 G01 II

    Read the official standard
  • Citation 2 · Item 8

    Asbestos

    $0proposed

    Other-than-serious29 CFR 1910.1001(j)(3)(i)Correct by Mar 31, 2027
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19101001 J03 I

    Read the official standard
  • Citation 2 · Item 9

    Asbestos

    $0proposed

    Other-than-serious29 CFR 1910.1001(j)(4)(iv)Correct by Mar 31, 2027
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19101001 J04 IV

    Read the official standard
  • Citation 2 · Item 10

    Asbestos

    $0proposed

    Other-than-serious29 CFR 1910.1001(k)(1)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19101001 K01

    Read the official standard
  • Citation 2 · Item 11

    Hazard communication

    $0proposed

    Other-than-serious29 CFR 1910.1200(f)(6)(ii)Correct by Sep 18, 2026
    What this standard covers

    Hazard communication, including chemical hazard information, labels, safety data sheets and training.

    Records you may want to gather

    • Existing written hazard communication program
    • Relevant safety data sheets and labels
    • Existing training records

    As published in the public record

    19101200 F06 II

    Read the official standard

Your response timeline

Contest and other responses, counted from the day you received the citation

Your response timeline

For certain responses, including a notice of contest, OSHA counts 15 working days from the day your company received the citation, not the date OSHA issued it. Enter that date to see the estimate.

The date it arrived (for example, the certified-mail delivery date).
An estimate from the date you enter. CiteClock does not verify when your citation arrived. Weekends and observed federal holidays are excluded; special closures or case-specific orders can change the timing. Confirm with the issuing OSHA area office or a qualified professional.How OSHA counts working days: 29 CFR 1903.22(c)

Plain-English guides: the first 15 working days after a citation, the informal conference and asking for more time to abate.

Official source

Official OSHA record · Inspection #1879695

Employer as published: WADSWORTH ATHENEUM MUSEUM OF ART

From the public record as of Nov 21, 2026.

Public case information shown here is sourced from official public enforcement records published by the U.S. Department of Labor. Check it against OSHA's own page before you rely on anything here.

  • Employer name
  • Inspection number
  • Citation items and classifications
  • Proposed penalties
  • Issuance and abatement dates

Proposed penalties in the public record: $74,161. Proposed, not a final amount.

Verify on OSHA.gov