6803 JOYCE STREET, SUITE A, ARVADA, CO 80007 · OSHA inspection 1893105 · citation issued Oct 8, 2026 · prepared Saturday, November 21, 2026
Independent software. Not affiliated with OSHA. Not legal advice. Prepared from the public OSHA enforcement record for the employer to review, complete and sign. Not a filing, not legal advice and not a statement of what OSHA will accept.
1. Certification letter
Abatement certification · draft
To: Area Director, OSHA Englewood Area Office Address: as printed on your citation
FAUSTSON TOOL CORP. 6803 JOYCE STREET, SUITE A, ARVADA, CO 80007
The hazards referenced in Inspection Number 1893105 for the violations identified below were corrected as follows:
Citation 1, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 2 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 3 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4a was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4b was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 1, Item 4c was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
Citation 2, Item 1 was corrected on date to be entered by: method to be enteredAwaiting your confirmation · not certified
I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.
Signature
Typed or printed name
Title
Date
Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.
Written lockout/tagout procedures · Plain-English summary, not legal advice
Procedures for controlling hazardous energy must be written down and used whenever employees service or maintain machines (a limited exception applies when a machine meets every listed condition). The procedures must clearly set out their scope, purpose, authorization, rules and the steps for shutting down, isolating, blocking and securing the machine, placing and removing locks or tags, and checking that the energy is controlled.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written energy-control (lockout/tagout) procedure for the machine
Training roster for authorized and affected employees
Record of the periodic inspection of the procedure
Photo of the lockout points and locks or tags
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Machine guarding · Plain-English summary, not legal advice
One or more methods of machine guarding must protect the operator and other employees in the machine area from hazards such as the point of operation, ingoing nip points, rotating parts, and flying chips and sparks. Barrier guards, two-hand tripping devices and electronic safety devices are examples.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the installed guard on the machine
Invoice or work order for the guard or repair
Equipment service record
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Photo of the corrected electrical condition (covers, cords, panel access)
Electrician's invoice or work order
Training roster if employees were retrained
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written hazard communication program · Plain-English summary, not legal advice
Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Labels on workplace containers · Plain-English summary, not legal advice
Each container of a hazardous chemical in the workplace must be labeled, tagged or marked, either with the full label information required on shipped containers or with the product identifier plus words, pictures or symbols giving at least general information about its hazards. Some exceptions apply to stationary and portable containers.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Hazard communication training · Plain-English summary, not legal advice
Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Page of your written hazard communication program
Safety data sheet index or binder page
Training roster with date and topics
Photo of the corrected container labels
Serious item: attach documents if your citation says they are required (1903.19(d)).
Suggestions only, not a statement of what OSHA requires or will accept.
Written certification of the PPE hazard assessment · Plain-English summary, not legal advice
The hazard assessment must be confirmed by a written certification that names the workplace evaluated, the person certifying it and the date(s) of the assessment, and identifies the document as a certification of hazard assessment.
Nov 23, 2026 per the public record · Verification required, no certification date estimated. Informal settlement on November 3, 2026, per the public record. A settlement or a petition to modify the abatement date can change the date and what has to be certified (29 CFR 1903.19(b)(2)(i)), so check the date against that document. The abatement date in the public record is November 23, 2026.
Public record: Abatement completion recorded in the public data.
Not yet confirmed by the employer. Nothing is certified for this item.
Evidence on file: 0 files
Possible supporting evidence
Written PPE hazard assessment certification
Purchase record for the protective equipment
Training roster
Suggestions only, not a statement of what OSHA requires or will accept.
3. Employee posting
Employee posting
Notice to employees: abatement certification
Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.
FAUSTSON TOOL CORP. will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1893105 and listed below have been corrected. A copy of the certification is available from the employer on request.
Each item below is listed on the final notice once you confirm it.
Citation 1, Item 1 (29 CFR 1910.147(c)(4)(i))
Citation 1, Item 2 (29 CFR 1910.212(a)(1))
Citation 1, Item 3 (29 CFR 1910.305(g)(1)(iii))
Citation 1, Item 4a (29 CFR 1910.1200(e)(1))
Citation 1, Item 4b (29 CFR 1910.1200(f)(6)(i))
Citation 1, Item 4c (29 CFR 1910.1200(h)(1))
Citation 2, Item 1 (29 CFR 1910.132(d)(2))
Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).
Posted on
Removed on
Posted by
4. Where to send it
Where to send this
OSHA Englewood Area Office
Identified from the office code in the public record (0830600). Send it to the address printed on your citation. OSHA office directory
Keep a copy of everything you send and the date you sent it.
Still needed from you
Your confirmation that all 7 items have been corrected, with the date and how
Verification of 7 abatement dates against your citation, settlement or final order: the public record does not settle them (see each item)
The name and title of the person signing
Signature of the employer or an authorized representative
Abatement dates are shown per the public record. If a settlement, petition or informal agreement changed your dates or items, use those.
Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19(c)).
No certification date is estimated for an item the public record shows as contested, settled or otherwise changed, or for a record not confirmed as Federal OSHA. Those items say "Verification required": check them against your citation, settlement agreement or final order.
No certification is required for an item your citation notes as corrected during the inspection (29 CFR 1903.19(c)(2)). The public data may say so too, but your citation is what counts.
Only certify items that are actually corrected. Knowingly false statements in documents required by the OSH Act are a federal offense (29 U.S.C. 666(g)).
The evidence ideas are suggestions, not a statement of what OSHA requires or will accept for a particular item.
29 CFR 1903.19 on eCFR · Independent software. Not affiliated with OSHA. Not legal advice.