Skip to content
Prepared from the public OSHA recordRetrieved Nov 21, 2026

Raptor Exteriors, Inc.Inspection #1896532 — 9 citation items

TINLEY PARK, IL · Citation issued Oct 14, 2026

Your OSHA case preview Free · from the public OSHA record

Inspection
#1896532
Citation items
92 Serious · 1 Other-than-serious · 6 Repeat
Abatement dates
Jul 17, 2026 – Nov 18, 2026Per the public record · 8 to verify against your copy
Citation status public record
7 of 9 with no completion recordedFinal order recorded for some items in DOL dataYour certification is generally due within 10 days after each abatement date
Evidence sections
9 item foldersSuggested: Photos · Invoices and receipts · Training records · Written programs

Certification estimated due Nov 28 — in 7 days (estimate)

6 items without an estimate: verification required (see each item).

Estimated from public-record abatement dates that nothing in the record changes, plus 10 calendar days (29 CFR 1903.19). If a settlement or agreement changed your dates, use those.

Your abatement packet is already drafted.

Your case, organized

  1. What the inspection contains Public record

    9 cited items under 29 CFR 1926.1060(a), 29 CFR 1926.552(a)(1), 29 CFR 1926.20(b)(1) and 6 more, issued Oct 14, 2026 by OSHA Chicago South Area Office.

  2. What you'll document From you

    For each item you have corrected: the date, what was done, and a photo or record that shows it. Then your signature on the certification. Nothing is confirmed for you.

  3. How CiteClock structures it Already drafted

    One section per item with suggested evidence (for example: “Photo of the corrected condition”), the certification letter in OSHA's sample format, the employee posting and where to send it. See the free draft PDF.

  4. After you unlock

    Confirm each corrected item, add photos and files from your phone, keep everything in one private case, and download the finished packet without the DRAFT mark.

Item by item

CiteClock prepared each item from the public record. After you buy, you confirm each one with the date and what you did, and add a photo.

  1. Citation 1 · Item 1a29 CFR 1926.1060(a)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1926.1060(a)

    What the public record says

    Serious · No abatement completion recorded in the public data

    Verification required Needs review

    The abatement date in the public record (July 31, 2026) is earlier than the citation's issue date (October 14, 2026), so it cannot be the date for this citation. Check it against your citation copy.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  2. Citation 1 · Item 1b29 CFR 1926.552(a)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1926.552(a)(1)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  3. Citation 2 · Item 1a29 CFR 1926.20(b)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Repeat item under 29 CFR 1926.20(b)(1)

    What the public record says

    Repeat · No abatement completion recorded in the public data

    Verification required Needs review

    The abatement date in the public record (July 31, 2026) is earlier than the citation's issue date (October 14, 2026), so it cannot be the date for this citation. Check it against your citation copy.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Willful or repeat item: documents showing abatement must be attached (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  4. Citation 2 · Item 1b29 CFR 1926.21(b)(2)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Repeat item under 29 CFR 1926.21(b)(2)

    What the public record says

    Repeat · No abatement completion recorded in the public data

    Verification required Needs review

    The abatement date in the public record (July 31, 2026) is earlier than the citation's issue date (October 14, 2026), so it cannot be the date for this citation. Check it against your citation copy.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Willful or repeat item: documents showing abatement must be attached (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  5. Citation 2 · Item 229 CFR 1926.100(a)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Head protection · Plain-English summary, not legal advice

    Employees working where there is a possible danger of head injury from impact, from falling or flying objects, or from electrical shock and burns must be protected by protective helmets.

    Official text

    What the public record says

    Repeat · No abatement completion recorded in the public data

    Verification required Needs review

    The abatement date in the public record (July 17, 2026) is earlier than the citation's issue date (October 14, 2026), so it cannot be the date for this citation. Check it against your citation copy.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Willful or repeat item: documents showing abatement must be attached (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  6. Citation 2 · Item 329 CFR 1926.102(a)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Repeat item under 29 CFR 1926.102(a)(1)

    What the public record says

    Repeat · No abatement completion recorded in the public data

    Verification required Needs review

    The abatement date in the public record (July 17, 2026) is earlier than the citation's issue date (October 14, 2026), so it cannot be the date for this citation. Check it against your citation copy.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Willful or repeat item: documents showing abatement must be attached (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  7. Citation 2 · Item 429 CFR 1926.501(b)(13)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Fall protection in residential construction · Plain-English summary, not legal advice

    Each employee doing residential construction work 6 feet or more above a lower level must be protected by guardrails, a safety net or a personal fall arrest system, unless another provision allows something else. If the employer can show those systems are infeasible or create a greater hazard, a written fall protection plan meeting 1926.502(k) is required instead.

    Official text

    What the public record says

    Repeat · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the fall protection in place
    • Fall protection training certification (1926.503)
    • Invoice for guardrails, nets or personal fall arrest equipment

    Willful or repeat item: documents showing abatement must be attached (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  8. Citation 2 · Item 529 CFR 1926.503(a)(1)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Fall protection training · Plain-English summary, not legal advice

    Each employee who might be exposed to fall hazards must be trained to recognize the hazards of falling and in the procedures to follow to minimize them.

    Official text

    What the public record says

    Repeat · No abatement completion recorded in the public data

    Verification required Needs review

    The abatement date in the public record (July 31, 2026) is earlier than the citation's issue date (October 14, 2026), so it cannot be the date for this citation. Check it against your citation copy.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the fall protection in place
    • Fall protection training certification (1926.503)
    • Invoice for guardrails, nets or personal fall arrest equipment

    Willful or repeat item: documents showing abatement must be attached (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  9. Citation 3 · Item 129 CFR 1903.19(c)(1)Abatement Nov 18
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Other-than-serious item under 29 CFR 1903.19(c)(1)

    What the public record says

    Other-than-serious · No abatement completion recorded in the public data

    Nov 18 per the public record Verified · certification generally due Nov 28 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Repair invoice, receipt or work order
    • Training roster, if employees were trained
    • Written program or procedure page, if one was changed

    Suggestions only, not a statement of what OSHA requires or will accept.

Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19). If a settlement changed your dates, use those. 29 CFR 1903.19

The packet, drafted

This is the draft for Raptor Exteriors, Inc. It stays marked DRAFT — PREVIEW until you confirm each item; the signature is always yours.

Abatement certification · draft

To: Area Director, OSHA Chicago South Area Office
Address: as printed on your citation

RAPTOR EXTERIORS, INC.
1140 SOUTH 5TH STREET, DEKALB, IL 60115

The hazards referenced in Inspection Number 1896532 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 1b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  3. Citation 2, Item 1a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  4. Citation 2, Item 1b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  5. Citation 2, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  6. Citation 2, Item 3 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  7. Citation 2, Item 4 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  8. Citation 2, Item 5 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  9. Citation 3, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

RAPTOR EXTERIORS, INC. will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1896532 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1a (29 CFR 1926.1060(a))
  • Citation 1, Item 1b (29 CFR 1926.552(a)(1))
  • Citation 2, Item 1a (29 CFR 1926.20(b)(1))
  • Citation 2, Item 1b (29 CFR 1926.21(b)(2))
  • Citation 2, Item 2 (29 CFR 1926.100(a))
  • Citation 2, Item 3 (29 CFR 1926.102(a)(1))
  • Citation 2, Item 4 (29 CFR 1926.501(b)(13))
  • Citation 2, Item 5 (29 CFR 1926.503(a)(1))
  • Citation 3, Item 1 (29 CFR 1903.19(c)(1))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

Where to send this

OSHA Chicago South Area Office

Identified from the office code in the public record (0521700). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 9 items have been corrected, with the date and how
  • A check of your citation for the 2 items the public record shows as corrected during the inspection. If the citation notes it, mark it: no certification is needed for those items (29 CFR 1903.19(c)(2))
  • Abatement documents for willful or repeat items (required by 1903.19(d))
  • A check of the abatement dates against your citation copy
  • The name and title of the person signing
  • Signature of the employer or an authorized representative

Not tonight? Get one reminder.

Email me a reminder 3 days before my estimated date (Nov 25).

Unlock this case

One-time payment per case. No subscription or scheduled renewal. Access continues while CiteClock operates, subject to the Terms of Service. Sales tax or VAT may be added at checkout where applicable.

Free preview

Free

You are looking at it.

  • Certification letter, item-by-item closeout and employee posting, drafted
  • Every item with its abatement date per the public record
  • Draft PDF marked DRAFT — PREVIEW

Self-Serve

$49 one time per case

A clear path from citation to a clean closeout packet, for one person.

  • One case · one user
  • Citation management and deadlines
  • Your own photos, PDFs and evidence
  • Missing-document checklist
  • Clean PDF and ZIP exports
  • Basic case history

COMMAND

$149 one time per case

Keep corrective work moving, from assignment to the next inspection.

  • Everything in Self-Serve
  • Up to 5 users on this case, including you
  • Corrective-action planning and task assignments
  • Secure worker evidence requests
  • Supervisor review and approval
  • Full audit history
  • Follow-up reminders and evidence checks
Exactly what the plan includes What you provide, what CiteClock drafts, what evidence the rule asks for and who signs
For this caseSelf-Serve $49 one time per caseCOMMAND $149 one time per case
What you provide
  • The facts from your citation and the dates you confirm.
  • What was corrected and when, in your own words, with supporting files.
  • The name and title of the person who signs.
  • The facts from your citation and the dates you confirm.
  • What was corrected and when, in your own words, with supporting files.
  • The name and title of the person who signs.
What CiteClock does
  • Software only: it does not read your photos, decide whether an item is fixed or check your workplace.
  • Organizes citation items, dates and your evidence.
  • Lists missing documents and builds clean PDF/ZIP outputs.
  • Keeps basic case history. One user on this case.
  • Software only: it does not read your photos, decide whether an item is fixed or check your workplace.
  • Organizes citation items, dates and your evidence.
  • Lists missing documents and builds clean PDF/ZIP outputs.
  • Adds draft corrective-action plans for you to review (drafted with AI; you decide what is kept), assignments, worker evidence links and supervisor approvals.
  • Keeps the full audit trail and schedules follow-up evidence checks.
  • Up to 5 people on this case, including its owner.
When it is ready
  • Work at your own pace. Download when you are ready.
  • Coordinate the work at your team’s pace. Download when you are ready.

Access continues while CiteClock operates, subject to the Terms of Service. Sales tax or VAT may be added at checkout where applicable. The $100 upgrade to COMMAND keeps the case's existing access terms. No subscription or scheduled renewal.

What evidence the rule asks for

  • Every item you certify: the date it was corrected and how (29 CFR 1903.19(c)).
  • Willful and repeat items: documents showing the correction, such as photos, receipts or training records (1903.19(d)).
  • Serious items: the same documents when your citation says so (1903.19(d)).
  • Other items: the rule does not require documents. A photo or record kept with the packet is optional.
  • Abatement plans and progress reports: only when your citation asks for them (1903.19(e) and (f)).

Read 29 CFR 1903.19

What you get

  • One PDF to sign and send: cover, items at a glance, the certification letter in the layout of OSHA's Appendix A sample (only the items you confirmed), each item with its files after it, the employee posting, where to send it and an evidence index.
  • Abatement plan and progress report forms in the Appendix B layout, when your citation requires them.
  • Your private case and archive: every file, confirmation and packet you send, kept with its date.

See a completed sample packet

Who verifies and signs

  • You confirm every fact. CiteClock never marks an item corrected for you.
  • The employer or an authorized representative signs the letter, sends the packet to the OSHA Area Office on the citation and posts the employee notice.
  • CiteClock lists what is missing. It cannot confirm a hazard was fixed, and it never signs, certifies or files anything with OSHA.

Not included

  • Legal advice, contesting or negotiating the citation, or dealing with OSHA for you. CiteClock is independent software, not a law firm, and not affiliated with OSHA.

You end with a packet like this one: See a completed sample packet

Your team does the corrective work. CiteClock keeps the tasks, evidence requests and closeout records together in one case.

Secure checkout by Paddle, our merchant of record. Organizing is free: sign in with your email and start. When you want the clean exports, confirm when the citation arrived, then pay. Full refund within 14 days.

About CiteClock

CiteClock Support
Independent software for OSHA abatement closeouts

CiteClock was built so an employer can close out a citation without paying for hours of someone sorting files. The draft above was prepared from the public record before you arrived. Questions about your case? A person at CiteClock reads every message: hello@citeclock.com

  • Public data only on this page. Everything here comes from the U.S. Department of Labor's public enforcement data. Privacy · Terms
  • Your files stay private. Photos and documents you add go to your private case, never to this page. No third-party tracking pixels or ad trackers.
  • You stay in control. You confirm every item and sign the certification. CiteClock never certifies anything for you.
  • Refunds and support. Full refund within 14 days. Refund policy · hello@citeclock.com

Independent software. Not affiliated with OSHA. Not legal advice. CiteClock does not predict outcomes or penalty changes, and it does not sign or file anything with OSHA.

Possibly related prior citation found — professional review recommended

The public record shows an earlier inspection under a matching employer name in the same state that cited the same section of the standards. The match is by name and section only; it is not confirmed to be the same employer, and it does not mean any item is or will be classified as repeated.

  • Inspection #1824510 RAPTOR EXTERIORS, INC. · final order Dec 3, 2025 · section 1926.20, 1926.21, 1926.102, 1926.100, 1926.501, 1926.503, 1903.19
  • Inspection #1817511 RAPTOR EXTERIORS, INC. · final order Dec 3, 2025 · section 1926.100, 1926.501, 1926.503, 1903.19
  • Inspection #1555486 RAPTOR EXTERIORS, INC. · final order Sep 2, 2022 · section 1926.100, 1926.503, 1926.501, 1903.19

OSHA's Field Operations Manual generally looks back about five years from a prior citation's final order; that window is policy guidance, not a legal limit, and only a final prior citation can support a repeated classification. For reference, the 2026 statutory maximum for a repeated violation is $165,514 per violation. That is a legal ceiling, not an expected penalty.

Standards cited in this inspection

Full citation text from the public record

9 items, as published
  • Citation 1 · Item 1a

    Stairway and ladder training

    $3,405proposed

    Serious29 CFR 1926.1060(a)Correct by Jul 31, 2026
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19261060 A

    Read the official standard
  • Citation 1 · Item 1b

    Cited standard

    $0proposed

    Serious29 CFR 1926.552(a)(1)Correction date: see your citation
    What this standard covers

    Records you may want to gather

    • The original citation and any correspondence about it
    • Existing records specifically identified in this citation item

    As published in the public record

    19260552 A01

    Read the official standard
  • Citation 2 · Item 1a

    General safety and health provisions

    $8,513proposed

    Repeat29 CFR 1926.20(b)(1)Correct by Jul 31, 2026
    What this standard covers

    General safety and health provisions for construction work.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19260020 B01

    Read the official standard
  • Citation 2 · Item 1b

    Safety training and education

    $0proposed

    Repeat29 CFR 1926.21(b)(2)Correct by Jul 31, 2026
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19260021 B02

    Read the official standard
  • Citation 2 · Item 2

    Head protection

    $17,023proposed

    Repeat29 CFR 1926.100(a)Correct by Jul 17, 2026
    What this standard covers

    Head protection in construction.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19260100 A

    Read the official standard
  • Citation 2 · Item 3

    Eye and face protection

    $8,513proposed

    Repeat29 CFR 1926.102(a)(1)Correct by Jul 17, 2026
    What this standard covers

    Eye and face protection in construction.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19260102 A01

    Read the official standard
  • Citation 2 · Item 4

    Duty to have fall protection

    $25,537proposed

    Repeat29 CFR 1926.501(b)(13)Correction date: see your citation
    What this standard covers

    Fall-protection duties for specified construction activities and working conditions.

    Records you may want to gather

    • Dated site photographs
    • Existing equipment and site inspection records
    • Relevant training and corrective-work records

    As published in the public record

    19260501 B13

    Read the official standard
  • Citation 2 · Item 5

    Fall protection training

    $17,023proposed

    Repeat29 CFR 1926.503(a)(1)Correct by Jul 31, 2026
    What this standard covers

    Training requirements for fall protection in construction.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19260503 A01

    Read the official standard
  • Citation 3 · Item 1

    Cited standard

    $478proposed

    Other-than-serious29 CFR 1903.19(c)(1)Correct by Nov 18, 2026
    What this standard covers

    Records you may want to gather

    • The original citation and any correspondence about it
    • Existing records specifically identified in this citation item

    As published in the public record

    19030019 C01

    Read the official standard

Your response timeline

Contest and other responses, counted from the day you received the citation

Your response timeline

For certain responses, including a notice of contest, OSHA counts 15 working days from the day your company received the citation, not the date OSHA issued it. Enter that date to see the estimate.

The date it arrived (for example, the certified-mail delivery date).
An estimate from the date you enter. CiteClock does not verify when your citation arrived. Weekends and observed federal holidays are excluded; special closures or case-specific orders can change the timing. Confirm with the issuing OSHA area office or a qualified professional.How OSHA counts working days: 29 CFR 1903.22(c)

Plain-English guides: the first 15 working days after a citation, the informal conference and asking for more time to abate.

Official source

Official OSHA record · Inspection #1896532

Employer as published: RAPTOR EXTERIORS, INC.

From the public record as of Nov 21, 2026.

Public case information shown here is sourced from official public enforcement records published by the U.S. Department of Labor. Check it against OSHA's own page before you rely on anything here.

  • Employer name
  • Inspection number
  • Citation items and classifications
  • Proposed penalties
  • Issuance and abatement dates

Proposed penalties in the public record: $80,492. Proposed, not a final amount.

Verify on OSHA.gov

CiteClock is independent software. It is not OSHA, not affiliated with the U.S. Department of Labor or any government agency, and not a law firm. This page is not a government notice.

Working with an attorney or safety consultant?