What the most-cited paragraphs say
1910.95(b)(1): Noise exposure controls
When employees are exposed to sound above the permissible levels in Table G-16 (for example, 90 dBA for 8 hours a day or 115 dBA for a quarter hour or less), the employer must use feasible administrative or engineering controls. If those controls do not bring sound levels within the table, personal protective equipment must be provided and used to bring them within it.
1910.95(c)(1): Hearing conservation program
When employee noise exposure reaches or exceeds an 8-hour time-weighted average of 85 decibels (A-weighted), or a 50 percent dose, the employer must run a continuing, effective hearing conservation program as described in paragraphs (c) through (o) of the standard, including monitoring, audiometric testing, hearing protectors, training and records.
Written from the official text on eCFR (title 29 as of 2026-10-05). The official text governs.
Typical abatement evidence for a 1903.19 certification
After a citation under 1910.95, the employer certifies to OSHA that each cited item was corrected, within 10 calendar days of its abatement date (1903.19(c)(1)). When documents are required, they may include evidence of the purchase or repair of equipment, photographs or video, or other written records (1903.19(d)(2)). Records employers commonly keep for this standard:
- Existing written program or procedure, if one applies
- Relevant training records
- Dated photographs of the cited condition and any corrective work
- Inspection, maintenance or repair records
- Records of corrective actions already taken
Examples only, not a list of what OSHA requires or will accept. Your citation says which items need documents. How abatement certification works · Sample certification letter.
Find your dates
Search the public record by company name or inspection number to see each cited item and its abatement date, or work out a certification due date with the abatement deadline calculator.
Recent public OSHA cases citing 1910.95
- Liebherr Aerospace Saline Inc., inspection 1905883 · issued Oct 13, 2026
- 317745023 - Riddle Laminators Inc, inspection 1910312 · issued Oct 13, 2026
- Town of Washington, inspection 1907172 · issued Oct 9, 2026
- Alloy Fabricators of New England Incorporated, inspection 1911576 · issued Oct 9, 2026
- Town of Washington, inspection 1907163 · issued Oct 9, 2026
- 112042 - Rural Metro Fire Department Inc, inspection 1917972 · issued Oct 8, 2026
- Consumers Concrete Corporation, inspection 1889388 · issued Oct 8, 2026
- Moises Vazquez, inspection 1885563 · issued Sep 30, 2026
- Caesars Entertainment Group, inspection 1895942 · issued Sep 30, 2026
- 77404 - Prime Materials Recovery Inc, inspection 1885448 · issued Sep 25, 2026
- Town of Warren, inspection 1912051 · issued Sep 25, 2026
- Eurostone LLC, inspection 1905581 · issued Sep 24, 2026
- Mainstreet Manufacturing Company LLC, inspection 1892248 · issued Sep 24, 2026
- Kelley Wood Products, Inc., inspection 1904379 · issued Sep 24, 2026
- Granitepro LLC, inspection 1890134 · issued Sep 23, 2026
- Nucor Rebar Fabrication Northeast LLC, inspection 1887009 · issued Sep 23, 2026
- Southern Tier Concrete Products, Inc., inspection 1883048 · issued Sep 22, 2026
- A.S.K. Foods, LLC, inspection 1891567 · issued Sep 21, 2026
- 77406 - Merchant Iron Works Inc, inspection 1885642 · issued Sep 21, 2026
- J & S Fabrications, inspection 1898995 · issued Sep 21, 2026
From the U.S. Department of Labor's public enforcement data. Verify each record on OSHA.gov.
Plain-English summary, not legal advice; see 29 CFR 1910.95 for the official text. Independent software. Not affiliated with OSHA. Not legal advice.