Skip to content
Prepared from the public OSHA recordRetrieved Nov 20, 2026

Terranetti Italian Bakery, Inc.Inspection #1878130 — 15 citation items

MECHANICSBURG, PA · Citation issued Aug 24, 2026

Your OSHA case preview Free · from the public OSHA record

Inspection
#1878130
Citation items
1515 Serious
Abatement dates
Sep 8, 2026 – Oct 9, 2026Per the public record · 6 to verify against your copy
Citation status public record
9 of 15 with no completion recordedYour certification is generally due within 10 days after each abatement date
Evidence sections
15 item foldersSuggested: Photos · Invoices and receipts · Training records · Written programs

Estimated date passed. If you haven't sent your certification yet, your packet is ready to finish.

Estimated from public-record abatement dates that nothing in the record changes, plus 10 calendar days (29 CFR 1903.19). If a settlement or agreement changed your dates, use those.

Your abatement packet is already drafted.

Your case, organized

  1. What the inspection contains Public record

    15 cited items under 29 CFR Section 5(a)(1) (General Duty Clause), 29 CFR 1910.37(b)(6), 29 CFR 1910.147(c)(1) and 12 more, issued Aug 24, 2026 by OSHA Harrisburg Area Office.

  2. What you'll document From you

    For each item you have corrected: the date, what was done, and a photo or record that shows it. Then your signature on the certification. Nothing is confirmed for you.

  3. How CiteClock structures it Already drafted

    One section per item with suggested evidence (for example: “Photo of the corrected condition”), the certification letter in OSHA's sample format, the employee posting and where to send it. See the free draft PDF.

  4. After you unlock

    Confirm each corrected item, add photos and files from your phone, keep everything in one private case, and download the finished packet without the DRAFT mark.

Item by item

CiteClock prepared each item from the public record. After you buy, you confirm each one with the date and what you did, and add a photo.

  1. Citation 1 · Item 129 CFR Section 5(a)(1) (General Duty Clause)Abatement Sep 8
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    General Duty Clause · Plain-English summary, not legal advice

    Section 5(a)(1) of the OSH Act requires each employer to provide employment and a place of employment free from recognized hazards that are causing or are likely to cause death or serious physical harm to employees. Your citation describes the hazard it refers to.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 8 per the public record Verified · certification generally due Sep 18 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected condition
    • Written procedure or program page that addresses the hazard
    • Training roster
    • Invoice for equipment or engineering changes

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  2. Citation 1 · Item 229 CFR 1910.37(b)(6)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.37(b)(6)

    What the public record says

    Serious · Recorded in the public data as corrected during the inspection

    If your citation also notes this item as corrected during the inspection, no abatement certification is required for it (29 CFR 1903.19(c)(2)). You mark that yourself in your case, from your citation copy.

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the cleared or marked exit route
    • Page of your emergency action or fire prevention plan
    • Training roster

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  3. Citation 1 · Item 3a29 CFR 1910.147(c)(1)Abatement Sep 18
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Energy control (lockout/tagout) program · Plain-English summary, not legal advice

    The employer must have an energy control program made up of written procedures, employee training and periodic inspections, so that before anyone services or maintains a machine that could start up or release stored energy unexpectedly, it is isolated from its energy source and made inoperative.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 18 per the public record Verified · certification generally due Sep 28 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written energy-control (lockout/tagout) procedure for the machine
    • Training roster for authorized and affected employees
    • Record of the periodic inspection of the procedure
    • Photo of the lockout points and locks or tags

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  4. Citation 1 · Item 3b29 CFR 1910.147(c)(4)(i)Abatement Sep 18
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Written lockout/tagout procedures · Plain-English summary, not legal advice

    Procedures for controlling hazardous energy must be written down and used whenever employees service or maintain machines (a limited exception applies when a machine meets every listed condition). The procedures must clearly set out their scope, purpose, authorization, rules and the steps for shutting down, isolating, blocking and securing the machine, placing and removing locks or tags, and checking that the energy is controlled.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 18 per the public record Verified · certification generally due Sep 28 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written energy-control (lockout/tagout) procedure for the machine
    • Training roster for authorized and affected employees
    • Record of the periodic inspection of the procedure
    • Photo of the lockout points and locks or tags

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  5. Citation 1 · Item 4a29 CFR 1910.219(d)(1)Abatement Sep 18
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.219(d)(1)

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 18 per the public record Verified · certification generally due Sep 28 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  6. Citation 1 · Item 4b29 CFR 1910.219(e)(1)(i)Abatement Sep 18
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.219(e)(1)(i)

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 18 per the public record Verified · certification generally due Sep 28 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  7. Citation 1 · Item 4c29 CFR 1910.219(f)(3)Abatement Sep 18
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.219(f)(3)

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 18 per the public record Verified · certification generally due Sep 28 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the installed guard on the machine
    • Invoice or work order for the guard or repair
    • Equipment service record

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  8. Citation 1 · Item 5a29 CFR 1910.303(g)(2)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.303(g)(2)(i)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  9. Citation 1 · Item 5b29 CFR 1910.305(b)(2)(i)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(b)(2)(i)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  10. Citation 1 · Item 6a29 CFR 1910.305(b)(1)(ii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(b)(1)(ii)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  11. Citation 1 · Item 6b29 CFR 1910.304(f)(1)(viii)Abatement Sep 8
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.304(f)(1)(viii)

    What the public record says

    Serious · No abatement completion recorded in the public data

    Sep 8 per the public record Verified · certification generally due Sep 18 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  12. Citation 1 · Item 7a29 CFR 1910.305(g)(2)(ii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(g)(2)(ii)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  13. Citation 1 · Item 7b29 CFR 1910.305(g)(2)(iii)Verification required
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Serious item under 29 CFR 1910.305(g)(2)(iii)

    What the public record says

    Serious · Abatement completion recorded in the public data

    Verification required Unavailable

    The public record has no abatement date for this item. Use the date on your citation.

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Photo of the corrected electrical condition (covers, cords, panel access)
    • Electrician's invoice or work order
    • Training roster if employees were retrained

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  14. Citation 1 · Item 8a29 CFR 1910.1200(e)(1)Abatement Oct 9
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Written hazard communication program · Plain-English summary, not legal advice

    Each workplace needs a written hazard communication program that is put into practice and kept up to date. It explains how labels, safety data sheets and employee training are handled, and it includes a list of the hazardous chemicals present and how employees are told about the hazards of non-routine tasks and of chemicals in unlabeled pipes.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Oct 9 per the public record Verified · certification generally due Oct 19 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written hazard communication program
    • Safety data sheet index or binder page
    • Training roster with date and topics
    • Photo of the corrected container labels

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

  15. Citation 1 · Item 8b29 CFR 1910.1200(h)(1)Abatement Oct 9
    1. Item
    2. Public record
    3. Abatement date
    4. Confirm corrected
    5. Add evidence
    6. Ready for packet

    Hazard communication training · Plain-English summary, not legal advice

    Employees must get effective information and training on the hazardous chemicals in their work area when they are first assigned there and whenever a new chemical hazard is brought in. Training can cover categories of hazards or specific chemicals; chemical-specific information must stay available through labels and safety data sheets.

    Official text

    What the public record says

    Serious · No abatement completion recorded in the public data

    Oct 9 per the public record Verified · certification generally due Oct 19 (estimate)

    You confirm this item in your private case, with the date and what you did. Nothing is ever confirmed for you.

    Possible supporting evidence

    • Page of your written hazard communication program
    • Safety data sheet index or binder page
    • Training roster with date and topics
    • Photo of the corrected container labels

    Serious item: attach documents if your citation says they are required (1903.19(d)).

    Suggestions only, not a statement of what OSHA requires or will accept.

Certification is generally due within 10 calendar days after each abatement date (29 CFR 1903.19). If a settlement changed your dates, use those. 29 CFR 1903.19

The packet, drafted

This is the draft for Terranetti Italian Bakery, Inc. It stays marked DRAFT — PREVIEW until you confirm each item; the signature is always yours.

Abatement certification · draft

To: Area Director, OSHA Harrisburg Area Office
Address: as printed on your citation

TERRANETTI ITALIAN BAKERY, INC.
844 WEST TRINDLE ROAD, MECHANICSBURG, PA 17055

The hazards referenced in Inspection Number 1878130 for the violations identified below were corrected as follows:

  1. Citation 1, Item 1 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  2. Citation 1, Item 2 was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  3. Citation 1, Item 3a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  4. Citation 1, Item 3b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  5. Citation 1, Item 4a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  6. Citation 1, Item 4b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  7. Citation 1, Item 4c was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  8. Citation 1, Item 5a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  9. Citation 1, Item 5b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  10. Citation 1, Item 6a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  11. Citation 1, Item 6b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  12. Citation 1, Item 7a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  13. Citation 1, Item 7b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  14. Citation 1, Item 8a was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified
  15. Citation 1, Item 8b was corrected on date to be entered by: method to be entered Awaiting your confirmation · not certified

I attest that the information contained in this document is accurate and that the affected employees and their representatives have been informed of the abatement.

Signature
Typed or printed name
Title
Date

Signed by the employer or an authorized representative. CiteClock never signs or certifies for you.

Employee posting

Notice to employees: abatement certification

Prepared with CiteClock from the employer's certification. This is not an official OSHA-issued form.

TERRANETTI ITALIAN BAKERY, INC. will certify to the Occupational Safety and Health Administration that the conditions cited in inspection 1878130 and listed below have been corrected. A copy of the certification is available from the employer on request.

Each item below is listed on the final notice once you confirm it.

  • Citation 1, Item 1 (29 CFR Section 5(a)(1) (General Duty Clause))
  • Citation 1, Item 2 (29 CFR 1910.37(b)(6))
  • Citation 1, Item 3a (29 CFR 1910.147(c)(1))
  • Citation 1, Item 3b (29 CFR 1910.147(c)(4)(i))
  • Citation 1, Item 4a (29 CFR 1910.219(d)(1))
  • Citation 1, Item 4b (29 CFR 1910.219(e)(1)(i))
  • Citation 1, Item 4c (29 CFR 1910.219(f)(3))
  • Citation 1, Item 5a (29 CFR 1910.303(g)(2)(i))
  • Citation 1, Item 5b (29 CFR 1910.305(b)(2)(i))
  • Citation 1, Item 6a (29 CFR 1910.305(b)(1)(ii))
  • Citation 1, Item 6b (29 CFR 1910.304(f)(1)(viii))
  • Citation 1, Item 7a (29 CFR 1910.305(g)(2)(ii))
  • Citation 1, Item 7b (29 CFR 1910.305(g)(2)(iii))
  • Citation 1, Item 8a (29 CFR 1910.1200(e)(1))
  • Citation 1, Item 8b (29 CFR 1910.1200(h)(1))

Post this notice near the place where each violation occurred, or where affected employees will readily see it, at the same time as or before the certification is sent to OSHA, for 3 working days (29 CFR 1903.19(g)).

Posted on
Removed on
Posted by

Where to send this

OSHA Harrisburg Area Office

Identified from the office code in the public record (0316700). Send it to the address printed on your citation. OSHA office directory

Keep a copy of everything you send and the date you sent it.

Still needed from you

  • Your confirmation that all 15 items have been corrected, with the date and how
  • A check of your citation for the item the public record shows as corrected during the inspection. If the citation notes it, mark it: no certification is needed for that item (29 CFR 1903.19(c)(2))
  • The name and title of the person signing
  • Signature of the employer or an authorized representative

Unlock this case

One-time payment per case. No subscription or scheduled renewal. Access continues while CiteClock operates, subject to the Terms of Service. Sales tax or VAT may be added at checkout where applicable.

Free preview

Free

You are looking at it.

  • Certification letter, item-by-item closeout and employee posting, drafted
  • Every item with its abatement date per the public record
  • Draft PDF marked DRAFT — PREVIEW

Self-Serve

$49 one time per case

A clear path from citation to a clean closeout packet, for one person.

  • One case · one user
  • Citation management and deadlines
  • Your own photos, PDFs and evidence
  • Missing-document checklist
  • Clean PDF and ZIP exports
  • Basic case history
Start Free — $49 at Export

COMMAND

$149 one time per case

Keep corrective work moving, from assignment to the next inspection.

  • Everything in Self-Serve
  • Up to 5 users on this case, including you
  • Corrective-action planning and task assignments
  • Secure worker evidence requests
  • Supervisor review and approval
  • Full audit history
  • Follow-up reminders and evidence checks
Unlock with COMMAND — $149
Exactly what the plan includes What you provide, what CiteClock drafts, what evidence the rule asks for and who signs
For this caseSelf-Serve $49 one time per caseCOMMAND $149 one time per case
What you provide
  • The facts from your citation and the dates you confirm.
  • What was corrected and when, in your own words, with supporting files.
  • The name and title of the person who signs.
  • The facts from your citation and the dates you confirm.
  • What was corrected and when, in your own words, with supporting files.
  • The name and title of the person who signs.
What CiteClock does
  • Software only: it does not read your photos, decide whether an item is fixed or check your workplace.
  • Organizes citation items, dates and your evidence.
  • Lists missing documents and builds clean PDF/ZIP outputs.
  • Keeps basic case history. One user on this case.
  • Software only: it does not read your photos, decide whether an item is fixed or check your workplace.
  • Organizes citation items, dates and your evidence.
  • Lists missing documents and builds clean PDF/ZIP outputs.
  • Adds draft corrective-action plans for you to review (drafted with AI; you decide what is kept), assignments, worker evidence links and supervisor approvals.
  • Keeps the full audit trail and schedules follow-up evidence checks.
  • Up to 5 people on this case, including its owner.
When it is ready
  • Work at your own pace. Download when you are ready.
  • Coordinate the work at your team’s pace. Download when you are ready.

Access continues while CiteClock operates, subject to the Terms of Service. Sales tax or VAT may be added at checkout where applicable. The $100 upgrade to COMMAND keeps the case's existing access terms. No subscription or scheduled renewal.

What evidence the rule asks for

  • Every item you certify: the date it was corrected and how (29 CFR 1903.19(c)).
  • Willful and repeat items: documents showing the correction, such as photos, receipts or training records (1903.19(d)).
  • Serious items: the same documents when your citation says so (1903.19(d)).
  • Other items: the rule does not require documents. A photo or record kept with the packet is optional.
  • Abatement plans and progress reports: only when your citation asks for them (1903.19(e) and (f)).

Read 29 CFR 1903.19

What you get

  • One PDF to sign and send: cover, items at a glance, the certification letter in the layout of OSHA's Appendix A sample (only the items you confirmed), each item with its files after it, the employee posting, where to send it and an evidence index.
  • Abatement plan and progress report forms in the Appendix B layout, when your citation requires them.
  • Your private case and archive: every file, confirmation and packet you send, kept with its date.

See a completed sample packet

Who verifies and signs

  • You confirm every fact. CiteClock never marks an item corrected for you.
  • The employer or an authorized representative signs the letter, sends the packet to the OSHA Area Office on the citation and posts the employee notice.
  • CiteClock lists what is missing. It cannot confirm a hazard was fixed, and it never signs, certifies or files anything with OSHA.

Not included

  • Legal advice, contesting or negotiating the citation, or dealing with OSHA for you. CiteClock is independent software, not a law firm, and not affiliated with OSHA.

You end with a packet like this one: See a completed sample packet

Your team does the corrective work. CiteClock keeps the tasks, evidence requests and closeout records together in one case.

Secure checkout by Paddle, our merchant of record. Organizing is free: sign in with your email and start. When you want the clean exports, confirm when the citation arrived, then pay. Full refund within 14 days.

Secure Checkout by Paddle. Billing note: Your purchase is for CiteClock. Paddle processes the payment as Merchant of Record. The operator’s registered name, Quote reclaim, may appear at checkout. Questions? hello@citeclock.com.

About CiteClock

CiteClock Support
Independent software for OSHA abatement closeouts

CiteClock was built so an employer can close out a citation without paying for hours of someone sorting files. The draft above was prepared from the public record before you arrived. Questions about your case? A person at CiteClock reads every message: hello@citeclock.com

  • Public data only on this page. Everything here comes from the U.S. Department of Labor's public enforcement data. Privacy · Terms
  • Your files stay private. Photos and documents you add go to your private case, never to this page. No third-party tracking pixels or ad trackers.
  • You stay in control. You confirm every item and sign the certification. CiteClock never certifies anything for you.
  • Refunds and support. Full refund within 14 days. Refund policy · hello@citeclock.com

Independent software. Not affiliated with OSHA. Not legal advice. CiteClock does not predict outcomes or penalty changes, and it does not sign or file anything with OSHA.

Standards cited in this inspection

Full citation text from the public record

15 items, as published
  • Citation 1 · Item 1

    General Duty Clause

    $2,270proposed

    SeriousSection 5(a)(1) (General Duty Clause)Correct by Sep 8, 2026
    What this standard covers

    Section 5(a)(1) of the OSH Act requires employers to keep the workplace free from recognized hazards that are causing or likely to cause death or serious physical harm.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    5A0001

    Read the official standard
  • Citation 1 · Item 2

    Exit routes: maintenance and safeguards

    $2,838proposed

    Serious29 CFR 1910.37(b)(6)Correction date: see your citation
    What this standard covers

    Maintenance, safeguards and operational features for exit routes.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100037 B06

    Read the official standard
  • Citation 1 · Item 3a

    Lockout/tagout (hazardous energy)

    $3,972proposed

    Serious29 CFR 1910.147(c)(1)Correct by Sep 18, 2026
    What this standard covers

    Control of hazardous energy during servicing and maintenance of machines and equipment.

    Records you may want to gather

    • Existing energy-control procedures
    • Relevant training records
    • Periodic inspection records
    • Dated records of corrective work, if any

    As published in the public record

    19100147 C01

    Read the official standard
  • Citation 1 · Item 3b

    Lockout/tagout (hazardous energy)

    $0proposed

    Serious29 CFR 1910.147(c)(4)(i)Correct by Sep 18, 2026
    What this standard covers

    Control of hazardous energy during servicing and maintenance of machines and equipment.

    Records you may want to gather

    • Existing energy-control procedures
    • Relevant training records
    • Periodic inspection records
    • Dated records of corrective work, if any

    As published in the public record

    19100147 C04 I

    Read the official standard
  • Citation 1 · Item 4a

    Mechanical power-transmission guarding

    $2,838proposed

    Serious29 CFR 1910.219(d)(1)Correct by Sep 18, 2026
    What this standard covers

    Guarding of mechanical power-transmission apparatus.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100219 D01

    Read the official standard
  • Citation 1 · Item 4b

    Mechanical power-transmission guarding

    $0proposed

    Serious29 CFR 1910.219(e)(1)(i)Correct by Sep 18, 2026
    What this standard covers

    Guarding of mechanical power-transmission apparatus.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100219 E01 I

    Read the official standard
  • Citation 1 · Item 4c

    Mechanical power-transmission guarding

    $0proposed

    Serious29 CFR 1910.219(f)(3)Correct by Sep 18, 2026
    What this standard covers

    Guarding of mechanical power-transmission apparatus.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100219 F03

    Read the official standard
  • Citation 1 · Item 5a

    Electrical: general requirements

    $1,702proposed

    Serious29 CFR 1910.303(g)(2)(i)Correction date: see your citation
    What this standard covers

    General requirements for electrical installations and equipment.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100303 G02 I

    Read the official standard
  • Citation 1 · Item 5b

    Electrical wiring methods and equipment

    $0proposed

    Serious29 CFR 1910.305(b)(2)(i)Correction date: see your citation
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 B02 I

    Read the official standard
  • Citation 1 · Item 6a

    Electrical wiring methods and equipment

    $3,405proposed

    Serious29 CFR 1910.305(b)(1)(ii)Correction date: see your citation
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 B01 II

    Read the official standard
  • Citation 1 · Item 6b

    Electrical wiring design and protection

    $0proposed

    Serious29 CFR 1910.304(f)(1)(viii)Correct by Sep 8, 2026
    What this standard covers

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100304 F01 VIII

    Read the official standard
  • Citation 1 · Item 7a

    Electrical wiring methods and equipment

    $1,929proposed

    Serious29 CFR 1910.305(g)(2)(ii)Correction date: see your citation
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 G02 II

    Read the official standard
  • Citation 1 · Item 7b

    Electrical wiring methods and equipment

    $0proposed

    Serious29 CFR 1910.305(g)(2)(iii)Correction date: see your citation
    What this standard covers

    Wiring methods, components and equipment for general electrical use.

    Records you may want to gather

    • Existing written program or procedure, if one applies
    • Relevant training records
    • Dated photographs of the cited condition and any corrective work
    • Inspection, maintenance or repair records
    • Records of corrective actions already taken

    As published in the public record

    19100305 G02 III

    Read the official standard
  • Citation 1 · Item 8a

    Hazard communication

    $2,838proposed

    Serious29 CFR 1910.1200(e)(1)Correct by Oct 9, 2026
    What this standard covers

    Hazard communication, including chemical hazard information, labels, safety data sheets and training.

    Records you may want to gather

    • Existing written hazard communication program
    • Relevant safety data sheets and labels
    • Existing training records

    As published in the public record

    19101200 E01

    Read the official standard
  • Citation 1 · Item 8b

    Hazard communication

    $0proposed

    Serious29 CFR 1910.1200(h)(1)Correct by Oct 9, 2026
    What this standard covers

    Hazard communication, including chemical hazard information, labels, safety data sheets and training.

    Records you may want to gather

    • Existing written hazard communication program
    • Relevant safety data sheets and labels
    • Existing training records

    As published in the public record

    19101200 H01

    Read the official standard

Your response timeline

Contest and other responses, counted from the day you received the citation

Your response timeline

For certain responses, including a notice of contest, OSHA counts 15 working days from the day your company received the citation, not the date OSHA issued it. Enter that date to see the estimate.

The date it arrived (for example, the certified-mail delivery date).
An estimate from the date you enter. CiteClock does not verify when your citation arrived. Weekends and observed federal holidays are excluded; special closures or case-specific orders can change the timing. Confirm with the issuing OSHA area office or a qualified professional.How OSHA counts working days: 29 CFR 1903.22(c)

Plain-English guides: the first 15 working days after a citation, the informal conference and asking for more time to abate.

Official source

Official OSHA record · Inspection #1878130

Employer as published: TERRANETTI ITALIAN BAKERY, INC.

From the public record as of Nov 20, 2026.

Public case information shown here is sourced from official public enforcement records published by the U.S. Department of Labor. Check it against OSHA's own page before you rely on anything here.

  • Employer name
  • Inspection number
  • Citation items and classifications
  • Proposed penalties
  • Issuance and abatement dates

Proposed penalties in the public record: $21,792. Proposed, not a final amount.

Verify on OSHA.gov